Asphalt mixing plant construction skills

The asphalt mixing plant is constructed according to a certain process, which can not only ensure the construction quality, but also ensure that the asphalt mixing plant is not damaged. Although the construction details are critical, the key skills of the asphalt mixing plant construction must be mastered.
Before the construction of the asphalt mixing plant, the top surface of the asphalt mixing plant construction range should be removed, and the dry and flat site elevation should be kept to meet the design requirements. If the ground surface is too soft, the foundation should be reinforced to prevent the construction machinery from becoming unstable and to ensure that the pile frame is vertical.

Rated 4.6/5 based on 222 customer reviews
Share:
Content

The asphalt mixing plant is constructed according to a certain process, which can not only ensure the construction quality, but also ensure that the asphalt mixing plant is not damaged. Although the construction details are critical, the key skills of the asphalt mixing plant construction must be mastered.
Before the construction of the asphalt mixing plant, the top surface of the asphalt mixing plant construction range should be removed, and the dry and flat site elevation should be kept to meet the design requirements. If the ground surface is too soft, the foundation should be reinforced to prevent the construction machinery from becoming unstable and to ensure that the pile frame is vertical.
Then, the construction machinery entering the site should be checked to ensure that the machinery is intact and assembled and tested under the premise of meeting the requirements. The verticality of the asphalt mixing plant should be ensured, and the deviation of the gantry guide and the mixing shaft from the verticality of the ground should not exceed 1.0%.
Regarding the layout of the asphalt mixing plant, it should be operated according to the pile position plan layout diagram, and the error should not exceed 2CM. The asphalt mixing plant is equipped with 110KVA construction electricity and Φ25mm water pipes to ensure that its power supply and various transportation management are normal and stable.
When the asphalt mixing plant is positioned, the mixer motor can be turned on, and the wet spraying method can be used to pre-mix the cut soil to make it sink; after the mixing shaft sinks to the designed depth, the drill can be lifted and sprayed at a speed of 0.45-0.8m/min.

Inquiry


    More Asphalt Processing

    Judging from the situation of highways in our country, asphalt pavement is the most used, which is one of the reasons why asphalt mixing plants have developed so rapidly. Under the situation of rapid economic development, the quality problems of asphalt pavement are gradually increasing, which puts forward higher and higher requirements for the quality of asphalt. It is understood that the primary factor that affects the quality of asphalt is the ratio of raw materials. This is also covered in the introduction of asphalt mixing stations. You can discuss it together.
    In order to obtain high-quality asphalt products, in addition to the asphalt mixing equipment meeting the requirements, selecting the appropriate asphalt mixture gradation type is also a top priority. According to my country’s current regulations, the maximum particle size of the asphalt mixture in the upper layer of the highway should not exceed half of the layer thickness; while the maximum particle size of the aggregate in the middle surface layer of asphalt mixture should not exceed two-thirds of the layer thickness; and the asphalt layer should not exceed half of the layer thickness. The maximum nominal aggregate size of the pavement structural layer mixture should not exceed one-third of the layer thickness.
    Based on this analysis, if an asphalt surface layer with a certain thickness is selected according to the above specifications, the particle size of the asphalt mixture aggregates will generally be larger, which will inevitably bring insurmountable construction difficulties to the construction of asphalt concrete pavement. After investigation, testing, analysis, and comparison, it can be seen that the lower layer has a wider choice, so the AG-201 gradation type can be used; while the selection of the upper layer mixture type is more difficult, and it is necessary to achieve a reasonable choice of this mix ratio. , on the one hand, we must examine as many aggregate resources as possible, and on the other hand, we must also consider the model of the mixing equipment.
    In order to ensure the quality of the project, strict selection and inspection of engineering materials must be carried out. Therefore, the selection and determination of raw materials should be based on the requirements for pavement structure and use quality, combined with the supply of floor materials, and inspection in accordance with the requirements of relevant test procedures, and then Select the best materials so that all technical indicators of the materials meet the specified technical requirements.

    The mobile forced asphalt mixing equipment adopts intermittent drying cylinder, double forced mixer, the main machine can be towed, small footprint, short installation cycle, convenient operation and maintenance, good stability, high degree of automation, high degree of standardization, and high quality of finished products, and the technology of continuous improvement. The mobile forced asphalt mixing plant is suitable for high-grade road asphalt paving and maintenance.
    1. The combined structure of the drum dryer and the batching machine is installed on a movable bracket for easy movement.
    2. The asphalt mixing plant is equipped with a double horizontal shaft to boil the aggregate and ensure uniform mixing.
    3. In the densely arranged hanging barrels, the hot aggregate rises vertically. This lifting tool is easy to use and reliable.
    4. For accurate weighing of aggregates, asphalt and powder ore, a measuring scale is used, which contains a weighing sensor for electronic measurement.
    5. The movement of the power material follows a closed spiral path, which ensures little material loss and provides safe transfer.
    6. On the cyclone burner, high-pressure oil is sprayed out and quickly atomized. In the combustion chamber, the material is fed in a spiral manner and automatically ignited by the oil mist, which ensures combustion efficiency. The cylindrical barrel of the burner is separated from the burner head. The furnace cavity can be pushed in and pulled out, which is convenient for replacing the damaged side column bricks inside the burner. The entire burner has a large heat capacity and high thermal strength. This is cost-effectiveness.