Home » Products » Asphalt Mixing Plant » Asphalt mixing plant disassembly process

Asphalt mixing plant disassembly process

The development prospects of asphalt mixing plants are very good, and the product competition on the market is also very fierce. When the equipment is used, uneven wear of the supporting wheels and wheel rails often occurs, and sometimes there are some abnormal noises and edge gnawing. The main reason is that after the asphalt mixing station has been working for a period of time, the drying cylinder is exposed to high temperature and friction occurs between the supporting wheel and the wheel rail.
Under the action of drying materials in an asphalt mixing station, the equipment will vibrate violently, which will directly lead to improper adjustment of the gap between the wheel rail and the supporting wheel, or mutual interference between the two. The position is skewed, so the operator needs to add grease to the surface contact positions of the supporting wheel and the calibrating wheel rail after every day’s work.

Rated 4.8/5 based on 483 customer reviews
Share:
Content

The development prospects of asphalt mixing plants are very good, and the product competition on the market is also very fierce. When the equipment is used, uneven wear of the supporting wheels and wheel rails often occurs, and sometimes there are some abnormal noises and edge gnawing. The main reason is that after the asphalt mixing station has been working for a period of time, the drying cylinder is exposed to high temperature and friction occurs between the supporting wheel and the wheel rail.
Under the action of drying materials in an asphalt mixing station, the equipment will vibrate violently, which will directly lead to improper adjustment of the gap between the wheel rail and the supporting wheel, or mutual interference between the two. The position is skewed, so the operator needs to add grease to the surface contact positions of the supporting wheel and the calibrating wheel rail after every day’s work.
When adding grease, you also need to pay attention to adjusting the tightness of the fixed nut in time, and then effectively adjust the gap between the supporting wheel and the calibrating wheel rail, so as to ensure smooth operation between the two. The contact points will receive relatively even force. In this way, there will be no obstacles when the asphalt mixing station is running.
The disassembly of an asphalt mixing plant is a relatively large and complex process. Before the equipment is dismantled, an implementable plan needs to be formulated based on its location and actual conditions. Then all disassembly and assembly personnel need to conduct comprehensive technical safety exchanges. Before dismantling the equipment, it is necessary to inspect, register and record the accessories and appearance of the equipment.
During installation, it is necessary to map out the mutual position diagram of the asphalt mixing station, so that it can be easily referenced by the staff during installation. All cables and wires inside the asphalt mixing station are not allowed to be cut when the asphalt mixing station is disassembled. The internal and external wire numbers in the equipment And the terminal board number can only be disassembled after confirming that there are no errors. Otherwise, the wire number identification needs to be adjusted.

Inquiry


    More Asphalt Processing

    The renovation of the combustion-supporting system of the asphalt mixing plant and the use of DC frequency conversion CNC machining technology are all renovations of the original system. In addition to the above renovation plans, with the existing equipment and personnel, what other measures can be taken in the application to reduce the operating costs of concrete mixing plants?
    At present, China has no mandatory national industry standards for heavy residual oil, and the quality of fuel oil varies greatly. Even from the same dealer, the quality difference between batches is very large, and it contains more residues. Therefore, bridge inspection equipment should be installed on the construction site, and professional personnel should inspect various performance parameters of gasoline and diesel to strictly control quality.
    When the burner is working, if the flame of the combustion aid is red and the smoke from the ash removal chimney is black, this is the manifestation of poor atomization of gasoline and diesel and insufficient combustion aid. At this time, the following measures should be taken to deal with it: properly adjust the distance between the nozzle and the vortex plate, generally push it inward to a suitable distance, the purpose is to prevent the atomized oil cone sprayed from the nozzle from spraying into the vortex plate; effectively adjust the ratio of gasoline and diesel to gas, so that the gasoline and diesel increase the mass conversion law slowly, or the gas increase the mass conversion law quickly; promptly remove the carbon deposits and coke around the nozzle to prevent the flame from deflecting; heavy residual oil contains more residues, which can easily cause serious damage to the high-pressure oil pump and increase the working pressure, affecting the actual effect of atomization and the shape of the flame, so the high-pressure oil pump must be repaired or replaced in time; install metal filter devices in front of the first and second high-pressure oil pumps, and clean them frequently to prevent the residues in the gasoline and diesel from blocking the nozzle.
    The operators should be trained in professional skills on a regular basis to strengthen their job responsibilities and moral education, so that they can establish their respective job responsibilities, understand the importance of their positions, understand the content of their work, and improve their professional level. Skilled operators can properly control the temperature of the asphalt mixing plant mixture to avoid gasoline and diesel waste.
    In order to improve the combustion-supporting effect and effectively reduce the operating costs of asphalt mixing stations, Sinoroader Group kindly reminds that the following issues should be noted when using the burner in the asphalt mixing station: To improve the maintenance of the burner, the burner nozzle should be cleaned of charred materials and carbon deposits on the ignition electrode regularly. The nozzle can be disassembled according to the atomization status; the air-oil ratio of the burner is generally not adjusted, and the fuel pump pressure can be adjusted according to the smoke status and the temperature of the asphalt mixture; the sulfur dioxide generated by the combustion of light fuel oil has a strong corrosion to the bag, so the bag should be maintained regularly and the air pressure changes in the bag should be paid close attention to; water deashing will produce more foam, causing the sand settling tank to flow out, so the sand settling tank should be cleaned in time, and a watering design should be carried out to settle the foam; when the steam pressure decreases or the gear oil pump noise increases, the gear oil pump must be replaced.
    When the burner is started, the fuel oil circulation system should be completed through the valve, and then the burner control box should be opened to start the burner. If the electronic ignition of the fuel oil fails, you can change the inlet tee and use the diesel engine for ignition. After the ignition is successful for 2 minutes, you can convert it into fuel oil. In this way, even the light fuel oil of lower quality can ensure combustion.