1.During the operation of asphalt mixing station equipment, in addition to ensuring that the asphalt mixing station equipment is in good condition, it should also be equipped with a mineral moisture content detector and a finished material tester, and the relevant data should be frequently tested for the operator to adjust the operation in time, so as to keep the equipment in good condition.
2. In addition to affecting production capacity, the moisture content of mineral materials is also the main factor that determines fuel consumption. Additional material sheds should be added.
3. Before operation, all working parts and devices of the asphalt mixing station equipment should be fully checked to see if they are intact and normal. If there is a problem, it must be properly handled before operation, and it is forbidden to operate with illness.
1.During the operation of asphalt mixing station equipment, in addition to ensuring that the asphalt mixing station equipment is in good condition, it should also be equipped with a mineral moisture content detector and a finished material tester, and the relevant data should be frequently tested for the operator to adjust the operation in time, so as to keep the equipment in good condition.
2. In addition to affecting production capacity, the moisture content of mineral materials is also the main factor that determines fuel consumption. Additional material sheds should be added.
3. Before operation, all working parts and devices of the asphalt mixing station equipment should be fully checked to see if they are intact and normal. If there is a problem, it must be properly handled before operation, and it is forbidden to operate with illness.
4. The operation must be carried out strictly in accordance with the procedures and precautions specified in the instruction manual. After the ignition is normal, the dust collector should be monitored to ensure that the drying drum burns under negative pressure; after the production starts, the hot material elevator and agitator should be monitored to see if they are working normally to coordinate the operation of other parts.
5. After the operation is completed, the feeding should be stopped, the burner should be gradually turned off, the agitator should be washed with hot fine material, and the hot material in the drying drum and the agitator should be drained; when the temperature of the drying drum drops to 45-500C, the operation of the drying drum, blower, and dust removal system should be stopped, and the main power supply of the operating room should be cut off.