Asphalt mixing plant is a complete set of equipment composed of many systems. It is widely used in the current society. Its components include batching system, drying system, combustion system, hot material lifting, weighing and mixing system and control system.
In the process of asphalt mixing, heating is an indispensable link, because there must be a system for heating in the asphalt mixing station, but the system generally fails for various reasons. So how should the heating system of the asphalt mixing station be improved? This article will briefly explain this issue.
Generally speaking, when the asphalt mixing station is running under low temperature conditions, the asphalt circulation pump and spray pump cannot operate normally, which will cause the asphalt in the asphalt scale to solidify, and then the asphalt mixing station cannot be produced. Therefore, the asphalt mixing station needs a heating system during operation.

Rated 4.7/5 based on 432 customer reviews
Share:
Content

Asphalt mixing plant is a complete set of equipment composed of many systems. It is widely used in the current society. Its components include batching system, drying system, combustion system, hot material lifting, weighing and mixing system and control system.
In the process of asphalt mixing, heating is an indispensable link, because there must be a system for heating in the asphalt mixing station, but the system generally fails for various reasons. So how should the heating system of the asphalt mixing station be improved? This article will briefly explain this issue.
Generally speaking, when the asphalt mixing station is running under low temperature conditions, the asphalt circulation pump and spray pump cannot operate normally, which will cause the asphalt in the asphalt scale to solidify, and then the asphalt mixing station cannot be produced. Therefore, the asphalt mixing station needs a heating system during operation.
Generally speaking, the main reason why the heating system cannot reach the required temperature is that the high-temperature oil tank of the heat transfer oil is too low, which leads to the unsmooth circulation of the heat transfer oil. It may also be because the inner layer of the double-layer tube is eccentric or the heat transfer oil pipeline is too long. Therefore, in response to these phenomena, the heating system of the asphalt mixing plant should raise the oil filling tank position, and then install the corresponding exhaust valve, the delivery pipeline also needs to be repaired accordingly, and a booster pump and insulation layer need to be added.

Inquiry


    More Asphalt Processing

    Judging from the situation of highways in our country, asphalt pavement is the most used, which is one of the reasons why asphalt mixing plants have developed so rapidly. Under the situation of rapid economic development, the quality problems of asphalt pavement are gradually increasing, which puts forward higher and higher requirements for the quality of asphalt. It is understood that the primary factor that affects the quality of asphalt is the ratio of raw materials. This is also covered in the introduction of asphalt mixing stations. You can discuss it together.
    In order to obtain high-quality asphalt products, in addition to the asphalt mixing equipment meeting the requirements, selecting the appropriate asphalt mixture gradation type is also a top priority. According to my country’s current regulations, the maximum particle size of the asphalt mixture in the upper layer of the highway should not exceed half of the layer thickness; while the maximum particle size of the aggregate in the middle surface layer of asphalt mixture should not exceed two-thirds of the layer thickness; and the asphalt layer should not exceed half of the layer thickness. The maximum nominal aggregate size of the pavement structural layer mixture should not exceed one-third of the layer thickness.
    Based on this analysis, if an asphalt surface layer with a certain thickness is selected according to the above specifications, the particle size of the asphalt mixture aggregates will generally be larger, which will inevitably bring insurmountable construction difficulties to the construction of asphalt concrete pavement. After investigation, testing, analysis, and comparison, it can be seen that the lower layer has a wider choice, so the AG-201 gradation type can be used; while the selection of the upper layer mixture type is more difficult, and it is necessary to achieve a reasonable choice of this mix ratio. , on the one hand, we must examine as many aggregate resources as possible, and on the other hand, we must also consider the model of the mixing equipment.
    In order to ensure the quality of the project, strict selection and inspection of engineering materials must be carried out. Therefore, the selection and determination of raw materials should be based on the requirements for pavement structure and use quality, combined with the supply of floor materials, and inspection in accordance with the requirements of relevant test procedures, and then Select the best materials so that all technical indicators of the materials meet the specified technical requirements.

    Asphalt mixing stations, also known as asphalt concrete mixing stations, can produce asphalt mixtures, modified asphalt mixtures, and colored asphalt mixtures, which fully meet the needs of building highways, grade roads, municipal roads, airports, ports, etc. Changmeng Electric Power introduces the safety operating procedures of asphalt mixing plants below:
    1. During the operation of the mixing equipment, in addition to ensuring that the equipment is in good condition, it should also be equipped with a mineral moisture content detector and a finished material tester, and the relevant data should be frequently tested for the operator to adjust the operation in time to keep the equipment in good condition.
    2. In addition to affecting production capacity, the moisture content of mineral materials is also the main factor determining fuel consumption. Additional material sheds should be added.
    3. Before operation, all working parts and devices of the mixing equipment should be fully checked to see if they are intact and normal. If there are any problems, they must be properly handled before operation, and it is forbidden to operate with illness.
    4. The operation must be carried out strictly in accordance with the procedures and precautions specified in the instruction manual. After normal ignition, the dust collector should be monitored to ensure that the drying drum burns under negative pressure; after production starts, the hot material elevator and agitator should be monitored to see if they are working normally to coordinate the operation of other parts.

    The renovation of the combustion-supporting system of the asphalt mixing plant and the use of DC frequency conversion CNC machining technology are all renovations of the original system. In addition to the above renovation plans, with the existing equipment and personnel, what other measures can be taken in the application to reduce the operating costs of concrete mixing plants?
    At present, China has no mandatory national industry standards for heavy residual oil, and the quality of fuel oil varies greatly. Even from the same dealer, the quality difference between batches is very large, and it contains more residues. Therefore, bridge inspection equipment should be installed on the construction site, and professional personnel should inspect various performance parameters of gasoline and diesel to strictly control quality.
    When the burner is working, if the flame of the combustion aid is red and the smoke from the ash removal chimney is black, this is the manifestation of poor atomization of gasoline and diesel and insufficient combustion aid. At this time, the following measures should be taken to deal with it: properly adjust the distance between the nozzle and the vortex plate, generally push it inward to a suitable distance, the purpose is to prevent the atomized oil cone sprayed from the nozzle from spraying into the vortex plate; effectively adjust the ratio of gasoline and diesel to gas, so that the gasoline and diesel increase the mass conversion law slowly, or the gas increase the mass conversion law quickly; promptly remove the carbon deposits and coke around the nozzle to prevent the flame from deflecting; heavy residual oil contains more residues, which can easily cause serious damage to the high-pressure oil pump and increase the working pressure, affecting the actual effect of atomization and the shape of the flame, so the high-pressure oil pump must be repaired or replaced in time; install metal filter devices in front of the first and second high-pressure oil pumps, and clean them frequently to prevent the residues in the gasoline and diesel from blocking the nozzle.
    The operators should be trained in professional skills on a regular basis to strengthen their job responsibilities and moral education, so that they can establish their respective job responsibilities, understand the importance of their positions, understand the content of their work, and improve their professional level. Skilled operators can properly control the temperature of the asphalt mixing plant mixture to avoid gasoline and diesel waste.
    In order to improve the combustion-supporting effect and effectively reduce the operating costs of asphalt mixing stations, Sinoroader Group kindly reminds that the following issues should be noted when using the burner in the asphalt mixing station: To improve the maintenance of the burner, the burner nozzle should be cleaned of charred materials and carbon deposits on the ignition electrode regularly. The nozzle can be disassembled according to the atomization status; the air-oil ratio of the burner is generally not adjusted, and the fuel pump pressure can be adjusted according to the smoke status and the temperature of the asphalt mixture; the sulfur dioxide generated by the combustion of light fuel oil has a strong corrosion to the bag, so the bag should be maintained regularly and the air pressure changes in the bag should be paid close attention to; water deashing will produce more foam, causing the sand settling tank to flow out, so the sand settling tank should be cleaned in time, and a watering design should be carried out to settle the foam; when the steam pressure decreases or the gear oil pump noise increases, the gear oil pump must be replaced.
    When the burner is started, the fuel oil circulation system should be completed through the valve, and then the burner control box should be opened to start the burner. If the electronic ignition of the fuel oil fails, you can change the inlet tee and use the diesel engine for ignition. After the ignition is successful for 2 minutes, you can convert it into fuel oil. In this way, even the light fuel oil of lower quality can ensure combustion.