Home » Products » Bitumen Processing » How does the modified asphalt equipment work? How is it heated?

How does the modified asphalt equipment work? How is it heated?

The modified asphalt equipment estimates the quality and uniformity of various raw materials from the material pile and conveyor at any time. The modified asphalt equipment checks the soil and oversized gravel, and checks whether there is any leakage in the cold hopper. Estimate whether the mixed material is mixed evenly, whether there is white material, whether the oil-stone ratio is reasonable, and check the concrete segregation of the asphalt mixture and the mixed material.
The modified asphalt equipment checks the control parameters of various basic parameters of the mixing device in the control room, the display values ??of the control screen, and the modified asphalt equipment checks whether the data statistics and display values ??of the computer and printout are consistent. Test the raw material heating temperature and the mixed material entry temperature of the modified asphalt equipment.

Rated 4.5/5 based on 316 customer reviews
Share:
Content

The modified asphalt equipment estimates the quality and uniformity of various raw materials from the material pile and conveyor at any time. The modified asphalt equipment checks the soil and oversized gravel, and checks whether there is any leakage in the cold hopper. Estimate whether the mixed material is mixed evenly, whether there is white material, whether the oil-stone ratio is reasonable, and check the concrete segregation of the asphalt mixture and the mixed material.
The modified asphalt equipment checks the control parameters of various basic parameters of the mixing device in the control room, the display values ??of the control screen, and the modified asphalt equipment checks whether the data statistics and display values ??of the computer and printout are consistent. Test the raw material heating temperature and the mixed material entry temperature of the modified asphalt equipment.
The staff of the modified asphalt equipment should cooperate with the staff of the laboratory, and adjust the mixing plant immediately according to the situation reflected by the laboratory test results, so that the mixed material ratio, temperature, and oil-stone ratio are within the required enterprise range. In the production and processing of modified asphalt equipment, the temperature of the modified asphalt equipment should meet the construction temperature requirements of hot-mixed cement concrete. The residual moisture content of the asphalt mixture blown dry by the modified asphalt equipment shall not exceed 1%. At the beginning of each day, the heating temperature should be raised for the first few batches of asphalt mixture, and the modified asphalt equipment and cold mix several pots of asphalt mixture waste should be added before the mixture is mixed with asphalt.
The mixing time of the modified asphalt equipment should be determined by trial mixing according to the actual situation, and the asphalt should be evenly coated with the asphalt mixture. The processing cycle of each batch of the modified asphalt equipment rotary mixer should not be less than 45s (the cold mixing time should be no less than 5~10s).
If there is water in the asphalt of the modified asphalt equipment, we need to open the external floating roof when the temperature is 100 degrees, and then open the asphalt tank, it will circulate to dry. During operation, we should pay special attention to the water level in the asphalt tank and make adjustments immediately. When the asphalt level gauge of the asphalt tank of the modified asphalt equipment centrifugal fan is lower than the position of the temperature gauge, we should turn off the asphalt pump to prevent the asphalt in the electric heater from flowing out. Before ignition, we need to fill the water tank with water. After the modified asphalt equipment and other mechanical equipment are fully prepared, we can see whether the connected area is firm.
If the modified asphalt equipment is put into the asphalt for the first time, we also need to open the automatic vent valve of the asphalt heating tank, and then let the asphalt enter the electric heating device. After we remove the water, we also need to observe the temperature change. If the temperature is too high and does not need to be released, we should immediately start the circulation cooling. Because the modified asphalt equipment needs to save dyes and ensure the efficiency of the modified asphalt equipment, it is necessary to add coal as little as possible, and the ash must be removed immediately.

Inquiry


    More Road Maintenance

    We need to prepare a lot of work when using modified asphalt equipment. What kind of work do we need to prepare? Next, let me briefly introduce the relevant knowledge points.
    1. Heat transfer oil heats and insulates the modified asphalt equipment and nozzle. After spraying, the asphalt pump and nozzle do not need to be cleaned with diesel. Use high-pressure air to press the asphalt in the pipeline and spray pipe back to the tank, and then blow the nozzle; use heat transfer oil to keep warm, so that the pipeline and nozzle are smooth and unobstructed. 2. Various asphalts can be spread: high-viscosity asphalt, hot asphalt, emulsified asphalt, etc.; the spreading width can be freely adjusted, each nozzle can be controlled separately, and the maximum spraying width is up to 6m. Flexible handheld spray guns can be used to spray asphalt on corners. 3. Excellent thermal insulation performance, average cooling ≤1-2℃/h. 4. Convenient loading and unloading function. In addition to filling asphalt from the asphalt tank port, hot asphalt can be sucked out by itself, and external asphalt can also be pumped and transferred. 5. The modified asphalt equipment is evenly spread, and the nozzle design can be used for triple overlapping spraying.
    The above are the relevant knowledge points of modified asphalt equipment. I hope the above content can be helpful to everyone. Thank you for your viewing and support. More information will be sorted out for you later. Please pay attention to our website updates.

    Bitumen decanter equipment can be placed in a complex system as an independent unit, replacing the existing heat source de-barreling method, or in parallel as a core component of a large set of equipment, or it can work independently to meet the requirements of small-scale construction operations.
    The Sinoroader bitumen decanter device is mainly composed of a de-barreling box, a lifting mechanism, a hydraulic thruster and an electrical control system. The box is divided into two chambers, the upper chamber is a barreled bitumen melting chamber, and heating coils are evenly distributed around it. The heating pipe and the bitumen barrel mainly exchange heat in a radiation manner to achieve the purpose of bitumen de-barreling. Several guide rails are the tracks for the bitumen barrel to enter. The lower chamber is mainly to continue heating the bitumen removed from the barrel to make the temperature reach the suction pump temperature (100℃), and then the asphalt pump is pumped into the upper chamber. At the same time, an empty barrel is pushed out at the rear end outlet. There is also an oil tank on the platform at the entrance of the asphalt barrel to prevent the dripping bitumen from flowing out.
    The inlet and outlet doors of the device adopt a spring automatic closing mechanism. The door can be automatically closed after the asphalt barrel is pushed in or out to reduce heat loss. A temperature gauge is installed at the asphalt outlet to observe the asphalt outlet temperature. The electrical control system can control the opening and closing of the hydraulic pump and the reversing of the electromagnetic reversing valve to realize the advance and retreat of the hydraulic cylinder. If the heating time is extended, a higher temperature can be obtained. The lifting mechanism adopts a cantilever structure. The bitumen barrel is lifted by an electric hoist, and then moved horizontally to place the bitumen barrel on the guide rail. A temperature gauge is installed at the outlet of the asphalt meltering equipment to observe its outlet temperature.