The modified asphalt equipment estimates the quality and uniformity of various raw materials from the material pile and conveyor at any time. The modified asphalt equipment checks the soil and oversized gravel, and checks whether there is any leakage in the cold hopper. Estimate whether the mixed material is mixed evenly, whether there is white material, whether the oil-stone ratio is reasonable, and check the concrete segregation of the asphalt mixture and the mixed material.
The modified asphalt equipment checks the control parameters of various basic parameters of the mixing device in the control room, the display values ??of the control screen, and the modified asphalt equipment checks whether the data statistics and display values ??of the computer and printout are consistent. Test the raw material heating temperature and the mixed material entry temperature of the modified asphalt equipment.
The modified asphalt equipment estimates the quality and uniformity of various raw materials from the material pile and conveyor at any time. The modified asphalt equipment checks the soil and oversized gravel, and checks whether there is any leakage in the cold hopper. Estimate whether the mixed material is mixed evenly, whether there is white material, whether the oil-stone ratio is reasonable, and check the concrete segregation of the asphalt mixture and the mixed material.
The modified asphalt equipment checks the control parameters of various basic parameters of the mixing device in the control room, the display values ??of the control screen, and the modified asphalt equipment checks whether the data statistics and display values ??of the computer and printout are consistent. Test the raw material heating temperature and the mixed material entry temperature of the modified asphalt equipment.
The staff of the modified asphalt equipment should cooperate with the staff of the laboratory, and adjust the mixing plant immediately according to the situation reflected by the laboratory test results, so that the mixed material ratio, temperature, and oil-stone ratio are within the required enterprise range. In the production and processing of modified asphalt equipment, the temperature of the modified asphalt equipment should meet the construction temperature requirements of hot-mixed cement concrete. The residual moisture content of the asphalt mixture blown dry by the modified asphalt equipment shall not exceed 1%. At the beginning of each day, the heating temperature should be raised for the first few batches of asphalt mixture, and the modified asphalt equipment and cold mix several pots of asphalt mixture waste should be added before the mixture is mixed with asphalt.
The mixing time of the modified asphalt equipment should be determined by trial mixing according to the actual situation, and the asphalt should be evenly coated with the asphalt mixture. The processing cycle of each batch of the modified asphalt equipment rotary mixer should not be less than 45s (the cold mixing time should be no less than 5~10s).
If there is water in the asphalt of the modified asphalt equipment, we need to open the external floating roof when the temperature is 100 degrees, and then open the asphalt tank, it will circulate to dry. During operation, we should pay special attention to the water level in the asphalt tank and make adjustments immediately. When the asphalt level gauge of the asphalt tank of the modified asphalt equipment centrifugal fan is lower than the position of the temperature gauge, we should turn off the asphalt pump to prevent the asphalt in the electric heater from flowing out. Before ignition, we need to fill the water tank with water. After the modified asphalt equipment and other mechanical equipment are fully prepared, we can see whether the connected area is firm.
If the modified asphalt equipment is put into the asphalt for the first time, we also need to open the automatic vent valve of the asphalt heating tank, and then let the asphalt enter the electric heating device. After we remove the water, we also need to observe the temperature change. If the temperature is too high and does not need to be released, we should immediately start the circulation cooling. Because the modified asphalt equipment needs to save dyes and ensure the efficiency of the modified asphalt equipment, it is necessary to add coal as little as possible, and the ash must be removed immediately.