Home » Products » Bitumen Processing » How to check the oil mark before using modified asphalt equipment

How to check the oil mark before using modified asphalt equipment

We need to prepare a lot of work when using modified asphalt equipment. What kind of work do we need to prepare? Next, let me briefly introduce the relevant knowledge points.
1. Heat transfer oil heats and insulates the modified asphalt equipment and nozzle. After spraying, the asphalt pump and nozzle do not need to be cleaned with diesel. Use high-pressure air to press the asphalt in the pipeline and spray pipe back to the tank, and then blow the nozzle; use heat transfer oil to keep warm, so that the pipeline and nozzle are smooth and unobstructed. 2. Various asphalts can be spread: high-viscosity asphalt, hot asphalt, emulsified asphalt, etc.; the spreading width can be freely adjusted, each nozzle can be controlled separately, and the maximum spraying width is up to 6m. Flexible handheld spray guns can be used to spray asphalt on corners. 3. Excellent thermal insulation performance, average cooling ≤1-2℃/h. 4. Convenient loading and unloading function. In addition to filling asphalt from the asphalt tank port, hot asphalt can be sucked out by itself, and external asphalt can also be pumped and transferred. 5. The modified asphalt equipment is evenly spread, and the nozzle design can be used for triple overlapping spraying.
The above are the relevant knowledge points of modified asphalt equipment. I hope the above content can be helpful to everyone. Thank you for your viewing and support. More information will be sorted out for you later. Please pay attention to our website updates.

Rated 4.6/5 based on 403 customer reviews
Share:
Content

We need to prepare a lot of work when using modified asphalt equipment. What kind of work do we need to prepare? Next, let me briefly introduce the relevant knowledge points.
1. Heat transfer oil heats and insulates the modified asphalt equipment and nozzle. After spraying, the asphalt pump and nozzle do not need to be cleaned with diesel. Use high-pressure air to press the asphalt in the pipeline and spray pipe back to the tank, and then blow the nozzle; use heat transfer oil to keep warm, so that the pipeline and nozzle are smooth and unobstructed. 2. Various asphalts can be spread: high-viscosity asphalt, hot asphalt, emulsified asphalt, etc.; the spreading width can be freely adjusted, each nozzle can be controlled separately, and the maximum spraying width is up to 6m. Flexible handheld spray guns can be used to spray asphalt on corners. 3. Excellent thermal insulation performance, average cooling ≤1-2℃/h. 4. Convenient loading and unloading function. In addition to filling asphalt from the asphalt tank port, hot asphalt can be sucked out by itself, and external asphalt can also be pumped and transferred. 5. The modified asphalt equipment is evenly spread, and the nozzle design can be used for triple overlapping spraying.
The above are the relevant knowledge points of modified asphalt equipment. I hope the above content can be helpful to everyone. Thank you for your viewing and support. More information will be sorted out for you later. Please pay attention to our website updates.

Inquiry


    More Road Maintenance

    Bitumen decanter equipment can be placed in a complex system as an independent unit, replacing the existing heat source de-barreling method, or in parallel as a core component of a large set of equipment, or it can work independently to meet the requirements of small-scale construction operations.
    The Sinoroader bitumen decanter device is mainly composed of a de-barreling box, a lifting mechanism, a hydraulic thruster and an electrical control system. The box is divided into two chambers, the upper chamber is a barreled bitumen melting chamber, and heating coils are evenly distributed around it. The heating pipe and the bitumen barrel mainly exchange heat in a radiation manner to achieve the purpose of bitumen de-barreling. Several guide rails are the tracks for the bitumen barrel to enter. The lower chamber is mainly to continue heating the bitumen removed from the barrel to make the temperature reach the suction pump temperature (100℃), and then the asphalt pump is pumped into the upper chamber. At the same time, an empty barrel is pushed out at the rear end outlet. There is also an oil tank on the platform at the entrance of the asphalt barrel to prevent the dripping bitumen from flowing out.
    The inlet and outlet doors of the device adopt a spring automatic closing mechanism. The door can be automatically closed after the asphalt barrel is pushed in or out to reduce heat loss. A temperature gauge is installed at the asphalt outlet to observe the asphalt outlet temperature. The electrical control system can control the opening and closing of the hydraulic pump and the reversing of the electromagnetic reversing valve to realize the advance and retreat of the hydraulic cylinder. If the heating time is extended, a higher temperature can be obtained. The lifting mechanism adopts a cantilever structure. The bitumen barrel is lifted by an electric hoist, and then moved horizontally to place the bitumen barrel on the guide rail. A temperature gauge is installed at the outlet of the asphalt meltering equipment to observe its outlet temperature.

    In modern highway maintenance work, how to repair asphalt pavement quickly and effectively has become one of the key issues. As an advanced repair technology, cold patching technology is very popular because of its convenient construction and remarkable effects.
    What is the cold patching process?
    Cold patching process, as the name suggests, refers to a technical method for repairing asphalt pavement without heating. This process uses a specially proportioned cold-patch asphalt mixture. This material can maintain good fluidity and adhesion even at lower temperatures, thus ensuring the quality of the repair.
    Advantages of cold patching process
    Fast construction: Cold patching materials can be directly applied to damaged areas without preheating, and are immediately open to traffic, greatly shortening repair time.
    All-weather construction: Whether in hot summer or cold winter, cold patching materials can be effectively constructed and are not affected by the weather.
    Easy to operate: Thanks to its good working properties, even small damaged areas can be repaired easily.
    Environmentally friendly: The construction process reduces environmental pollution and is in line with the concept of green construction.
    Application scenarios
    The cold patching process is suitable for various types of pavement repair work, especially those places where traffic needs to be restored quickly, such as urban main roads, highway ramps, etc. In addition, the cold patching process is also an ideal choice for remote areas or situations where professional heating equipment is lacking.
    In short, the cold patching process has occupied a place in the field of rapid repair of asphalt pavement with its unique advantages and has become an indispensable part of modern highway maintenance.

    We have conducted in-depth research on asphalt distributors and have accumulated a lot of production technology experience. We have conducted professional and in-depth research on some problems existing in the market to provide convenience for everyone in future production applications.
    Every time when spraying asphalt, the asphalt distributor does not spray asphalt. Troubleshooting. The asphalt distributor does not spray asphalt. It is a common fault. The following teaches you how to solve the problem of not spraying asphalt.
    1. No asphalt spraying
    Analysis of the reasons may be the following reasons:
    1. Is the asphalt pump working?
    2. Are the valves adjusted correctly?
    3. Is the pump or pipeline blocked?
    2. Troubleshooting method
    1. Check whether the hydraulic system is working properly?
    2. After adjusting the valve position, the asphalt distributor must be cleaned to avoid pipeline blockage when used next time. Because the asphalt distributor has different high and low configurations, it can spread various high-viscosity and high-temperature modified asphalts and rubber asphalt in high configuration. If you mistakenly use a low-configuration asphalt truck to spread this type of asphalt, you must spray the asphalt inside the entire vehicle clean after the first use. After spraying, in order to leave no residual asphalt, you can use waste diesel to clean it. Our company’s vehicles are equipped with air cleaning and gravity cleaning devices. Diesel cleaning is a reliable cleaning method.

    Emulsified asphalt is made by hot melting asphalt, dispersing it in an aqueous solution containing an emulsifier in a fine particle state through mechanical action, forming an oil-in-water asphalt emulsion. In road construction and maintenance projects, emulsified asphalt can be used for road maintenance, bonding between road layers, bridge deck paving, permeable oil on cement-stabilized macadam foundation, slurry seal waterproof layer, etc. It has the advantages of cold construction, safety, environmental protection, resource conservation, energy conservation, extended construction season, and improved construction conditions. It plays a very important role in the construction and maintenance of municipal roads, especially in recent years, the improvement of the production level of emulsified asphalt has actively promoted the technological progress and promotion and application of emulsified asphalt. However, in the production and use of emulsified asphalt, undesirable phenomena such as crusting, flocculation, oil-water stratification, and agglomeration often occur, which brings unnecessary troubles to construction. To this end, the author conducted a large number of experimental studies from nine aspects, including emulsification equipment, emulsifier, base asphalt, pH value, temperature, storage temperature, mechanical action, freezing and melting, and long-term placement, and summarized the factors that affect the stability of emulsified asphalt. The analysis is as follows: