How to deal with the failure of the electronic control system of the asphalt mixing plant?

The core of the asphalt mixing plant is its electronic control system. If it has problems, it will cause a lot of trouble to use. However, in actual use, the electronic control system in the asphalt mixing plant will inevitably encounter some problems and failures. How to solve it at this time?
If only the instrument display of the electronic control system of the asphalt mixing plant is inaccurate, it means that the weighing system may be affected by external forces; or the drift error of the sensor causes the weighing zero position or weighing interval to change; it may also be caused by sensor damage.

Rated 4.9/5 based on 315 customer reviews
Share:
Content

The core of the asphalt mixing plant is its electronic control system. If it has problems, it will cause a lot of trouble to use. However, in actual use, the electronic control system in the asphalt mixing plant will inevitably encounter some problems and failures. How to solve it at this time?
If only the instrument display of the electronic control system of the asphalt mixing plant is inaccurate, it means that the weighing system may be affected by external forces; or the drift error of the sensor causes the weighing zero position or weighing interval to change; it may also be caused by sensor damage.
In the face of similar problems, the first thing to do is to eliminate the external force of the electronic control system of the asphalt mixing plant and recalibrate the weighing zero position. If it is a weighing of multiple sensors, it is necessary to consider the unbalanced load; if it is unbalanced, a sensor may be damaged or the cable may be loose or broken. In this case, the sensor should be replaced and the cable should be checked.
Sometimes the batching accuracy of the electronic control system of the asphalt mixing plant becomes poor, which is manifested in that during the batching process, the weighing value displayed by the batching control instrument is accurate, but the weighing value of the batching does not match the set value, and the batching accuracy exceeds the allowable range.
There are many reasons for this kind of failure, including inappropriate settings of fast and slow batching; large fluctuations in feed flow leading to large changes in overshoot; large changes in dryness and humidity of materials; too large tolerance range setting value; too short delay time for over-tolerance inspection; unreasonable settings for automatic compensation and over-tolerance inspection of instrument parameters; unreasonable settings for digital filtering and batching time parameters, etc.
It is necessary to clarify the specific causes of the failure in the asphalt mixing plant in order to solve them in a targeted manner. For example, the initial overshoot should be as close to the actual value as possible; at the same time, the batching flow should be appropriately reduced to ensure the balance of dryness and humidity of the material; and the allowable deviation value should be set not to exceed the batching accuracy range; and other parameter values ??should be set reasonably.

Inquiry


    More Asphalt Processing

    The mobile forced asphalt mixing equipment adopts intermittent drying cylinder, double forced mixer, the main machine can be towed, small footprint, short installation cycle, convenient operation and maintenance, good stability, high degree of automation, high degree of standardization, and high quality of finished products, and the technology of continuous improvement. The mobile forced asphalt mixing plant is suitable for high-grade road asphalt paving and maintenance.
    1. The combined structure of the drum dryer and the batching machine is installed on a movable bracket for easy movement.
    2. The asphalt mixing plant is equipped with a double horizontal shaft to boil the aggregate and ensure uniform mixing.
    3. In the densely arranged hanging barrels, the hot aggregate rises vertically. This lifting tool is easy to use and reliable.
    4. For accurate weighing of aggregates, asphalt and powder ore, a measuring scale is used, which contains a weighing sensor for electronic measurement.
    5. The movement of the power material follows a closed spiral path, which ensures little material loss and provides safe transfer.
    6. On the cyclone burner, high-pressure oil is sprayed out and quickly atomized. In the combustion chamber, the material is fed in a spiral manner and automatically ignited by the oil mist, which ensures combustion efficiency. The cylindrical barrel of the burner is separated from the burner head. The furnace cavity can be pushed in and pulled out, which is convenient for replacing the damaged side column bricks inside the burner. The entire burner has a large heat capacity and high thermal strength. This is cost-effectiveness.

    The drive unit is one of the important components of the asphalt mixing plant, so whether it can be reliably operated must be highly valued to avoid adverse effects on the entire asphalt mixing plant. In order to ensure that the drive unit in the asphalt mixing plant is indeed complete and reliable, the following maintenance measures are essential.
    The first thing to pay attention to is the universal rotating part of the drive unit of the asphalt mixing plant. This part has always been a fault-prone part. In order to reduce the occurrence of faults, grease should be added on time, and the wear should be checked frequently, and repaired and replaced in time. Users should also prepare the universal shaft assembly to avoid affecting the working process of the entire asphalt mixer.
    Secondly, the cleanliness of the hydraulic oil used in the asphalt mixing plant must be ensured. After all, the working environment of the equipment is relatively harsh, so it is necessary to prevent sewage and mud from entering the hydraulic system. The hydraulic oil should also be replaced regularly according to the requirements of the manual. Once water or mud is found mixed in the hydraulic oil during inspection, the hydraulic system should be stopped immediately to clean the hydraulic system and replace the hydraulic oil.
    Since there is a hydraulic system, of course, a matching cooling device is also required, which is also an important focus in the drive system of the asphalt mixing plant. To ensure that its function can be fully exerted, on the one hand, the hydraulic oil radiator should be cleaned regularly to prevent the radiator from being blocked by cement; on the other hand, the radiator electric fan should be checked to see if it is running normally to prevent the hydraulic oil temperature from exceeding the standard.
    In general, as long as the hydraulic oil of the asphalt mixing plant drive device is kept clean, there are generally few faults; but the service life varies from manufacturer to manufacturer, so pay attention to its alkalinity observation and replace it in real time.

    For road construction machinery, the following is mainly about the asphalt mixer in road construction machinery equipment. Because it is the key product of Wuxi road construction machinery manufacturers, it is necessary to carry out comprehensive training and mastery, so as to ensure meticulousness and practicality, and not ignore any knowledge points.
    1. In road construction machinery, is there any difference between asphalt mixing equipment and asphalt concrete mixing equipment?
    The answer given by Sinoroader Group manufacturer to this question is no, that is, there is no difference between asphalt mixing equipment and asphalt concrete mixing equipment. They refer to the same type of equipment, but they are different in name. It can be said that they are two names for the same type of equipment, and there is no difference in essence.
    2. During the operation of the asphalt mixer, there is a sound in the mixing pot. What’s the matter?
    In the view of Sinoroader Group, there are two answers to this question. One is that the mixer arm on the asphalt mixer is not good or damaged. The second is that the wear-resistant lining in the mixer is damaged, which leads to this problem.
    3. What are the dust removal devices in the asphalt mixing equipment?
    In the asphalt mixing equipment, for its dust removal device, Sinoroader Group believes that the key is to use the dry ash removal method, because it can facilitate the collection of raw materials. In terms of its dust removal equipment type, there are filter dust removal equipment, centrifugal fan dust removal equipment and force dust removal equipment, etc., which can all be used well.
    For the asphalt mixer and asphalt mixing equipment in road construction machinery, I believe that through the practical discussion of the above relevant content, everyone can master it well and master it, so that in practice, they can have new gains and benefit a lot from it.

    Asphalt mixing stations, also known as asphalt concrete mixing stations, can produce asphalt mixtures, modified asphalt mixtures, and colored asphalt mixtures, which fully meet the needs of building highways, grade roads, municipal roads, airports, ports, etc. Changmeng Electric Power introduces the safety operating procedures of asphalt mixing plants below:
    1. During the operation of the mixing equipment, in addition to ensuring that the equipment is in good condition, it should also be equipped with a mineral moisture content detector and a finished material tester, and the relevant data should be frequently tested for the operator to adjust the operation in time to keep the equipment in good condition.
    2. In addition to affecting production capacity, the moisture content of mineral materials is also the main factor determining fuel consumption. Additional material sheds should be added.
    3. Before operation, all working parts and devices of the mixing equipment should be fully checked to see if they are intact and normal. If there are any problems, they must be properly handled before operation, and it is forbidden to operate with illness.
    4. The operation must be carried out strictly in accordance with the procedures and precautions specified in the instruction manual. After normal ignition, the dust collector should be monitored to ensure that the drying drum burns under negative pressure; after production starts, the hot material elevator and agitator should be monitored to see if they are working normally to coordinate the operation of other parts.