Home » Products » Asphalt Mixing Plant » How to deal with the failure of the electronic control system of the asphalt mixing plant?

How to deal with the failure of the electronic control system of the asphalt mixing plant?

The core of the asphalt mixing plant is its electronic control system. If it has problems, it will cause a lot of trouble to use. However, in actual use, the electronic control system in the asphalt mixing plant will inevitably encounter some problems and failures. How to solve it at this time?
If only the instrument display of the electronic control system of the asphalt mixing plant is inaccurate, it means that the weighing system may be affected by external forces; or the drift error of the sensor causes the weighing zero position or weighing interval to change; it may also be caused by sensor damage.

Rated 5/5 based on 259 customer reviews
Share:
Content

The core of the asphalt mixing plant is its electronic control system. If it has problems, it will cause a lot of trouble to use. However, in actual use, the electronic control system in the asphalt mixing plant will inevitably encounter some problems and failures. How to solve it at this time?
If only the instrument display of the electronic control system of the asphalt mixing plant is inaccurate, it means that the weighing system may be affected by external forces; or the drift error of the sensor causes the weighing zero position or weighing interval to change; it may also be caused by sensor damage.
In the face of similar problems, the first thing to do is to eliminate the external force of the electronic control system of the asphalt mixing plant and recalibrate the weighing zero position. If it is a weighing of multiple sensors, it is necessary to consider the unbalanced load; if it is unbalanced, a sensor may be damaged or the cable may be loose or broken. In this case, the sensor should be replaced and the cable should be checked.
Sometimes the batching accuracy of the electronic control system of the asphalt mixing plant becomes poor, which is manifested in that during the batching process, the weighing value displayed by the batching control instrument is accurate, but the weighing value of the batching does not match the set value, and the batching accuracy exceeds the allowable range.
There are many reasons for this kind of failure, including inappropriate settings of fast and slow batching; large fluctuations in feed flow leading to large changes in overshoot; large changes in dryness and humidity of materials; too large tolerance range setting value; too short delay time for over-tolerance inspection; unreasonable settings for automatic compensation and over-tolerance inspection of instrument parameters; unreasonable settings for digital filtering and batching time parameters, etc.
It is necessary to clarify the specific causes of the failure in the asphalt mixing plant in order to solve them in a targeted manner. For example, the initial overshoot should be as close to the actual value as possible; at the same time, the batching flow should be appropriately reduced to ensure the balance of dryness and humidity of the material; and the allowable deviation value should be set not to exceed the batching accuracy range; and other parameter values ??should be set reasonably.

Inquiry


    More Asphalt Processing

    The actual operation steps of drying drum of asphalt mixing equipment: 1. Pay attention to routine inspection; 2. Proper operation steps; 3. Effective maintenance.
    Drying drum is a cylindrical device specially used for heating and drying stones in asphalt mixing equipment. Proper application and maintenance of drying drum can maximize the performance of drying drum, increase its service life and reduce application cost. Let’s take a look at the actual operation steps below.
    1. Pay attention to routine inspections
    The asphalt mixing equipment drying drum has been tested and inspected before leaving the factory, but it will be subjected to vibration and vibration during transportation to the construction site. A comprehensive inspection should be carried out before use: check whether all anchor bolts are tightened; whether all key pins are properly driven; whether all drive devices are adjusted according to the manufacturer’s instructions; whether all pipe connections are appropriate and whether the three-way joints are reliable; whether the entire equipment is fully lubricated; start the motor and check whether all parts can rotate steadily in the correct rotation direction; whether the pressure gauge can work normally and whether the valve is adjusted to the correct working pressure; whether the burner ignition mechanism is available and whether the gate valve is open.
    2. Correct operation steps
    After the equipment is started, it is recommended to control the machine manually at the beginning, and then switch to the automatic control mode after achieving the required production volume and pouring temperature. The stone should be dried and have a stable moisture content as much as possible so that the stone can maintain a stable final temperature when passing through the drying drum. If the stones delivered to the drying drum change frequently and the moisture content changes each time, the burner should be adjusted frequently to compensate for these changes.
    The stones directly from the crushed stone have a relatively constant moisture content, while the stones from the outdoor storage yard have a higher moisture content, and the moisture content of different piles varies greatly. Therefore, it is best for the stones to come from the same source.

    The drive unit is one of the important components of the asphalt mixing plant, so whether it can be reliably operated must be highly valued to avoid adverse effects on the entire asphalt mixing plant. In order to ensure that the drive unit in the asphalt mixing plant is indeed complete and reliable, the following maintenance measures are essential.
    The first thing to pay attention to is the universal rotating part of the drive unit of the asphalt mixing plant. This part has always been a fault-prone part. In order to reduce the occurrence of faults, grease should be added on time, and the wear should be checked frequently, and repaired and replaced in time. Users should also prepare the universal shaft assembly to avoid affecting the working process of the entire asphalt mixer.
    Secondly, the cleanliness of the hydraulic oil used in the asphalt mixing plant must be ensured. After all, the working environment of the equipment is relatively harsh, so it is necessary to prevent sewage and mud from entering the hydraulic system. The hydraulic oil should also be replaced regularly according to the requirements of the manual. Once water or mud is found mixed in the hydraulic oil during inspection, the hydraulic system should be stopped immediately to clean the hydraulic system and replace the hydraulic oil.
    Since there is a hydraulic system, of course, a matching cooling device is also required, which is also an important focus in the drive system of the asphalt mixing plant. To ensure that its function can be fully exerted, on the one hand, the hydraulic oil radiator should be cleaned regularly to prevent the radiator from being blocked by cement; on the other hand, the radiator electric fan should be checked to see if it is running normally to prevent the hydraulic oil temperature from exceeding the standard.
    In general, as long as the hydraulic oil of the asphalt mixing plant drive device is kept clean, there are generally few faults; but the service life varies from manufacturer to manufacturer, so pay attention to its alkalinity observation and replace it in real time.