How to do daily maintenance of modified asphalt equipment

Whether it is the application of modified asphalt equipment or the application of other equipment, if you want to extend its service life, you need to do daily maintenance work. In order to better help everyone, we have modified asphalt The maintenance methods that can be adopted when using the equipment are introduced as follows:

Rated 4.7/5 based on 439 customer reviews
Share:
Content

Whether it is the application of modified asphalt equipment or the application of other equipment, if you want to extend its service life, you need to do daily maintenance work. In order to better help everyone, we have modified asphalt The maintenance methods that can be adopted when using the equipment are introduced as follows:
(1) The emulsifier, delivery pump, and other motors, mixers, and valves should be maintained every day. Shandong modified asphalt equipment manufacturer
(2) If the modified asphalt equipment is out of service for a long time, the liquid in the tank and pipes should be emptied, all hole covers should be tightly closed and kept clean, and all running parts should be filled with lubricating oil. The rust in the tank should be removed when used for the first time and when used again after a long period of disuse, and the water filter should be cleaned regularly.
(3) The speed-regulating pump used to control flow should be regularly tested for accuracy and adjusted and maintained in a timely manner. Modified asphalt equipment should regularly check the matching gap between its stator and rotor. When the minimum gap specified by the machine cannot be reached, replacement of the stator and rotor should be considered.
(4) After each shift, the emulsifier of the modified asphalt equipment should be cleaned.
(5) Regularly check whether the terminals in the electrical control cabinet are loose and whether the wires are worn during shipment. Remove dust to avoid damage to the machine parts. The frequency converter is a precision instrument. Please refer to the instruction manual for specific use and maintenance.

Inquiry


    More Road Maintenance

    Bitumen decanter equipment can be placed in a complex system as an independent unit, replacing the existing heat source de-barreling method, or in parallel as a core component of a large set of equipment, or it can work independently to meet the requirements of small-scale construction operations.
    The Sinoroader bitumen decanter device is mainly composed of a de-barreling box, a lifting mechanism, a hydraulic thruster and an electrical control system. The box is divided into two chambers, the upper chamber is a barreled bitumen melting chamber, and heating coils are evenly distributed around it. The heating pipe and the bitumen barrel mainly exchange heat in a radiation manner to achieve the purpose of bitumen de-barreling. Several guide rails are the tracks for the bitumen barrel to enter. The lower chamber is mainly to continue heating the bitumen removed from the barrel to make the temperature reach the suction pump temperature (100℃), and then the asphalt pump is pumped into the upper chamber. At the same time, an empty barrel is pushed out at the rear end outlet. There is also an oil tank on the platform at the entrance of the asphalt barrel to prevent the dripping bitumen from flowing out.
    The inlet and outlet doors of the device adopt a spring automatic closing mechanism. The door can be automatically closed after the asphalt barrel is pushed in or out to reduce heat loss. A temperature gauge is installed at the asphalt outlet to observe the asphalt outlet temperature. The electrical control system can control the opening and closing of the hydraulic pump and the reversing of the electromagnetic reversing valve to realize the advance and retreat of the hydraulic cylinder. If the heating time is extended, a higher temperature can be obtained. The lifting mechanism adopts a cantilever structure. The bitumen barrel is lifted by an electric hoist, and then moved horizontally to place the bitumen barrel on the guide rail. A temperature gauge is installed at the outlet of the asphalt meltering equipment to observe its outlet temperature.