How to effectively control the cost of asphalt mixing plants?

Due to certain restrictions on the current development status and conditions, the profits of the domestic asphalt pavement construction industry are getting lower and lower. Therefore, in the process of using asphalt mixing plants for production, on the one hand, the quality of the products and customer requirements must be ensured. , on the other hand, it is necessary to reduce production costs. Therefore, cost management is very important, and refined management should be implemented in this regard.
First, for device management. Since equipment is the foundation and key of production, in the cost management of asphalt mixing stations, the management of equipment plays an important role in reducing costs. Only by managing the equipment well can the normal working status be ensured, which provides the necessary guarantee for the smooth progress of the project. In fact, in today’s highway projects, equipment costs account for a large part of the cost and profit. The huge profits after the construction of a highway will be greatly affected by the management of materials and equipment.

Rated 4.6/5 based on 433 customer reviews
Share:
Content

Due to certain restrictions on the current development status and conditions, the profits of the domestic asphalt pavement construction industry are getting lower and lower. Therefore, in the process of using asphalt mixing plants for production, on the one hand, the quality of the products and customer requirements must be ensured. , on the other hand, it is necessary to reduce production costs. Therefore, cost management is very important, and refined management should be implemented in this regard.
First, for device management. Since equipment is the foundation and key of production, in the cost management of asphalt mixing stations, the management of equipment plays an important role in reducing costs. Only by managing the equipment well can the normal working status be ensured, which provides the necessary guarantee for the smooth progress of the project. In fact, in today’s highway projects, equipment costs account for a large part of the cost and profit. The huge profits after the construction of a highway will be greatly affected by the management of materials and equipment.
Of course, in this work, it is necessary to formulate a practical management plan and arrange specific personnel to be responsible and inspected. Establish a dedicated asphalt mixing station maintenance and repair team, including maintenance and repair work before, during and after production. Establish and improve the job responsibilities of employees so that they understand the responsibilities and obligations of their positions; and carefully keep equipment maintenance records to facilitate future review and handling of equipment failures; and formulate corresponding equipment inspection systems and inspection-related items and terms, regularly inspect each component of the equipment and make detailed inspection records.
Secondly, safety management. Safety is a factor in production. Normally, because a large amount of supplies and materials are stored in the working site of an asphalt mixing plant, such as diesel, gas, asphalt, and high-voltage electricity, there are certain safety hazards, which will directly It involves the lives and property of enterprises and employees, so work in this area must be done to prevent accidents.
In response to this safety issue, a complete safety protection system should be established. In the actual work of the asphalt mixing station, the functions and responsibilities of each part should be clarified, and necessary safety signs, warning signs, etc. should be set up; emergency treatment plans and measures should be formulated in advance. , In addition, a strict inspection system must be implemented and various safety management tasks must be continuously improved.

Inquiry


    More Asphalt Processing

    The drying drum of the asphalt mixing plant should pay attention to daily inspection, correct operation and reasonable maintenance, so as to extend its service life and reduce the cost of engineering use.
    1. Pay attention to daily inspection. Before the asphalt mixing plant officially works, the drying drum needs to be tested and inspected to see whether each pipeline is reliably connected, whether the lubrication of the whole machine is feasible, whether the motor can be started, whether the functions of each pressure valve are stable, whether the instrument is normal, etc.
    2. Correct operation of the mixing station. At the beginning of the asphalt mixing plant, manual operation can only switch to automatic control after reaching the specified production capacity and discharge temperature. The aggregate should be dry and have a standard mode so that it can maintain a constant temperature when flowing through the drying drum. When the entire aggregate is sent to dry, the moisture content will change. At this time, the burner should be used frequently to compensate for the change in moisture. During the rolling stone processing, the amount of water directly formed is basically unchanged, the amount of combustion accumulation increases, and the amount of water in the deposited accumulation material may change.
    3. Reasonable maintenance of the asphalt mixing plant. Aggregates should be deactivated when the asphalt mixing plant is not in operation. After work every day, the equipment should be operated to discharge the aggregate into the dryer. When the material in the hopper leaves the combustion chamber, the combustion chamber should be closed and allowed to idle for about 30 minutes to cool down, so as to reduce its impact or make the machine run in a straight line. Install the drying cylinder fixing ring on all rollers synchronously.

    The renovation of the combustion-supporting system of the asphalt mixing plant and the use of DC frequency conversion CNC machining technology are all renovations of the original system. In addition to the above renovation plans, with the existing equipment and personnel, what other measures can be taken in the application to reduce the operating costs of concrete mixing plants?
    At present, China has no mandatory national industry standards for heavy residual oil, and the quality of fuel oil varies greatly. Even from the same dealer, the quality difference between batches is very large, and it contains more residues. Therefore, bridge inspection equipment should be installed on the construction site, and professional personnel should inspect various performance parameters of gasoline and diesel to strictly control quality.
    When the burner is working, if the flame of the combustion aid is red and the smoke from the ash removal chimney is black, this is the manifestation of poor atomization of gasoline and diesel and insufficient combustion aid. At this time, the following measures should be taken to deal with it: properly adjust the distance between the nozzle and the vortex plate, generally push it inward to a suitable distance, the purpose is to prevent the atomized oil cone sprayed from the nozzle from spraying into the vortex plate; effectively adjust the ratio of gasoline and diesel to gas, so that the gasoline and diesel increase the mass conversion law slowly, or the gas increase the mass conversion law quickly; promptly remove the carbon deposits and coke around the nozzle to prevent the flame from deflecting; heavy residual oil contains more residues, which can easily cause serious damage to the high-pressure oil pump and increase the working pressure, affecting the actual effect of atomization and the shape of the flame, so the high-pressure oil pump must be repaired or replaced in time; install metal filter devices in front of the first and second high-pressure oil pumps, and clean them frequently to prevent the residues in the gasoline and diesel from blocking the nozzle.
    The operators should be trained in professional skills on a regular basis to strengthen their job responsibilities and moral education, so that they can establish their respective job responsibilities, understand the importance of their positions, understand the content of their work, and improve their professional level. Skilled operators can properly control the temperature of the asphalt mixing plant mixture to avoid gasoline and diesel waste.
    In order to improve the combustion-supporting effect and effectively reduce the operating costs of asphalt mixing stations, Sinoroader Group kindly reminds that the following issues should be noted when using the burner in the asphalt mixing station: To improve the maintenance of the burner, the burner nozzle should be cleaned of charred materials and carbon deposits on the ignition electrode regularly. The nozzle can be disassembled according to the atomization status; the air-oil ratio of the burner is generally not adjusted, and the fuel pump pressure can be adjusted according to the smoke status and the temperature of the asphalt mixture; the sulfur dioxide generated by the combustion of light fuel oil has a strong corrosion to the bag, so the bag should be maintained regularly and the air pressure changes in the bag should be paid close attention to; water deashing will produce more foam, causing the sand settling tank to flow out, so the sand settling tank should be cleaned in time, and a watering design should be carried out to settle the foam; when the steam pressure decreases or the gear oil pump noise increases, the gear oil pump must be replaced.
    When the burner is started, the fuel oil circulation system should be completed through the valve, and then the burner control box should be opened to start the burner. If the electronic ignition of the fuel oil fails, you can change the inlet tee and use the diesel engine for ignition. After the ignition is successful for 2 minutes, you can convert it into fuel oil. In this way, even the light fuel oil of lower quality can ensure combustion.