How to save energy when using asphalt mixing plant equipment?
At present, most asphalt mixing plants have different degrees of energy loss in use, and these losses have brought us serious waste. How to reduce energy consumption in these aspects and achieve efficient production?
First of all, we must first summarize which aspects have energy loss, and then we can find reasonable solutions based on these problems. Through research, it is found that there are four problems in the use of asphalt mixing plants and the production of asphalt mixtures. The content and measures are as follows:
The first aspect is the management of the pile. We can reduce the energy consumption of the asphalt mixing plant through 3 specific methods: 1. Appropriately reduce the stacking height of the pile; 2. Build an inclined pile site with a good drainage structure; 3. Build a waterproof canopy.
At present, most asphalt mixing plants have different degrees of energy loss in use, and these losses have brought us serious waste. How to reduce energy consumption in these aspects and achieve efficient production?
First of all, we must first summarize which aspects have energy loss, and then we can find reasonable solutions based on these problems. Through research, it is found that there are four problems in the use of asphalt mixing plants and the production of asphalt mixtures. The content and measures are as follows:
The first aspect is the management of the pile. We can reduce the energy consumption of the asphalt mixing plant through 3 specific methods: 1. Appropriately reduce the stacking height of the pile; 2. Build an inclined pile site with a good drainage structure; 3. Build a waterproof canopy.
On the second aspect, the energy consumption of asphalt mixing plants can be saved by improving the performance of aggregate drying and heating systems. The specific measures are: 1. Make the fuel burn fully as much as possible; 2. Reduce the excess air coefficient of the burner; 3. Reduce the cold air sucked from the inlet of cold aggregate; 4. Make the heat exchange process between high-temperature gas and cold aggregate smoother; 5. Reduce the temperature of the gas at the outlet of the drying drum; 6. Reduce the heat loss of the wall of the drying drum; 7. Shorten the path length of the gas discharged into the atmosphere to reduce the heat dissipation area of ??the gas in the pipeline, thereby reducing the heat loss in the gas; 8. Reduce the heat loss of the hot aggregate at the outlet of the drying drum during the transportation to the mixing cylinder.
On the third aspect, the asphalt mixing plant equipment must be used correctly. This can not only reduce energy consumption, but also extend the service life of the equipment and save costs. The main measures are: 1. Reasonably determine the heating temperature of aggregates, asphalt and mixtures; 2. Correctly select the mesh of the screen and debug the production mix ratio; 3. Correctly operate and use the drying and heating system.
On the fourth aspect, adopt more technology to properly control the temperature requirements of the asphalt mixing plant for hot mixes. In recent times, warm mix asphalt technology with less energy consumption has developed rapidly, which is very beneficial to the current energy conservation and emission reduction policies.