Key points in asphalt mixing plants construction skills

Asphalt mixing stations are constructed according to a certain process, which can not only ensure the construction quality, but also ensure that the asphalt mixing station is not damaged. Although construction details are critical, the key skills of asphalt mixing station construction must be mastered.
Before the construction of the asphalt mixing plant, the top surface of the asphalt mixing station construction range should be removed, and the site elevation should be kept dry and flat to meet the design requirements. If the surface is too soft, the foundation should be reinforced to prevent the construction machinery from losing stability and ensure that the pile frame is vertical.
Then the on-site construction machinery should be inspected to ensure that the machinery is intact and assembled and tested under the premise of meeting the requirements. To ensure the verticality of the asphalt mixing plant, the deviation of the gantry guide and the mixing shaft from the verticality of the ground shall not exceed 1.0%. Asphalt mixer manufacturer.

Rated 4.9/5 based on 531 customer reviews
Share:
Content

Asphalt mixing stations are constructed according to a certain process, which can not only ensure the construction quality, but also ensure that the asphalt mixing station is not damaged. Although construction details are critical, the key skills of asphalt mixing station construction must be mastered.
Before the construction of the asphalt mixing plant, the top surface of the asphalt mixing station construction range should be removed, and the site elevation should be kept dry and flat to meet the design requirements. If the surface is too soft, the foundation should be reinforced to prevent the construction machinery from losing stability and ensure that the pile frame is vertical.
Then the on-site construction machinery should be inspected to ensure that the machinery is intact and assembled and tested under the premise of meeting the requirements. To ensure the verticality of the asphalt mixing plant, the deviation of the gantry guide and the mixing shaft from the verticality of the ground shall not exceed 1.0%. Asphalt mixer manufacturer.
Regarding the layout of the asphalt mixing station, it should be operated according to the pile position plan layout diagram, and the error shall not exceed 2CM. The asphalt mixing station is equipped with 110KVA construction electricity and Φ25mm water pipes to ensure its power supply and various transportation management are normal and stable. When the asphalt mixing plant is positioned and ready, the mixer motor can be turned on, and the wet spraying method can be used to pre-mix the cut soil to make it sink; after the mixing shaft sinks to the designed depth, the drill can be lifted and sprayed at a speed of 0.45-0.8m/min.

Inquiry


    More Asphalt Processing

    The renovation of the combustion-supporting system of the asphalt mixing plant and the use of DC frequency conversion CNC machining technology are all renovations of the original system. In addition to the above renovation plans, with the existing equipment and personnel, what other measures can be taken in the application to reduce the operating costs of concrete mixing plants?
    At present, China has no mandatory national industry standards for heavy residual oil, and the quality of fuel oil varies greatly. Even from the same dealer, the quality difference between batches is very large, and it contains more residues. Therefore, bridge inspection equipment should be installed on the construction site, and professional personnel should inspect various performance parameters of gasoline and diesel to strictly control quality.
    When the burner is working, if the flame of the combustion aid is red and the smoke from the ash removal chimney is black, this is the manifestation of poor atomization of gasoline and diesel and insufficient combustion aid. At this time, the following measures should be taken to deal with it: properly adjust the distance between the nozzle and the vortex plate, generally push it inward to a suitable distance, the purpose is to prevent the atomized oil cone sprayed from the nozzle from spraying into the vortex plate; effectively adjust the ratio of gasoline and diesel to gas, so that the gasoline and diesel increase the mass conversion law slowly, or the gas increase the mass conversion law quickly; promptly remove the carbon deposits and coke around the nozzle to prevent the flame from deflecting; heavy residual oil contains more residues, which can easily cause serious damage to the high-pressure oil pump and increase the working pressure, affecting the actual effect of atomization and the shape of the flame, so the high-pressure oil pump must be repaired or replaced in time; install metal filter devices in front of the first and second high-pressure oil pumps, and clean them frequently to prevent the residues in the gasoline and diesel from blocking the nozzle.
    The operators should be trained in professional skills on a regular basis to strengthen their job responsibilities and moral education, so that they can establish their respective job responsibilities, understand the importance of their positions, understand the content of their work, and improve their professional level. Skilled operators can properly control the temperature of the asphalt mixing plant mixture to avoid gasoline and diesel waste.
    In order to improve the combustion-supporting effect and effectively reduce the operating costs of asphalt mixing stations, Sinoroader Group kindly reminds that the following issues should be noted when using the burner in the asphalt mixing station: To improve the maintenance of the burner, the burner nozzle should be cleaned of charred materials and carbon deposits on the ignition electrode regularly. The nozzle can be disassembled according to the atomization status; the air-oil ratio of the burner is generally not adjusted, and the fuel pump pressure can be adjusted according to the smoke status and the temperature of the asphalt mixture; the sulfur dioxide generated by the combustion of light fuel oil has a strong corrosion to the bag, so the bag should be maintained regularly and the air pressure changes in the bag should be paid close attention to; water deashing will produce more foam, causing the sand settling tank to flow out, so the sand settling tank should be cleaned in time, and a watering design should be carried out to settle the foam; when the steam pressure decreases or the gear oil pump noise increases, the gear oil pump must be replaced.
    When the burner is started, the fuel oil circulation system should be completed through the valve, and then the burner control box should be opened to start the burner. If the electronic ignition of the fuel oil fails, you can change the inlet tee and use the diesel engine for ignition. After the ignition is successful for 2 minutes, you can convert it into fuel oil. In this way, even the light fuel oil of lower quality can ensure combustion.

    The actual operation steps of drying drum of asphalt mixing equipment: 1. Pay attention to routine inspection; 2. Proper operation steps; 3. Effective maintenance.
    Drying drum is a cylindrical device specially used for heating and drying stones in asphalt mixing equipment. Proper application and maintenance of drying drum can maximize the performance of drying drum, increase its service life and reduce application cost. Let’s take a look at the actual operation steps below.
    1. Pay attention to routine inspections
    The asphalt mixing equipment drying drum has been tested and inspected before leaving the factory, but it will be subjected to vibration and vibration during transportation to the construction site. A comprehensive inspection should be carried out before use: check whether all anchor bolts are tightened; whether all key pins are properly driven; whether all drive devices are adjusted according to the manufacturer’s instructions; whether all pipe connections are appropriate and whether the three-way joints are reliable; whether the entire equipment is fully lubricated; start the motor and check whether all parts can rotate steadily in the correct rotation direction; whether the pressure gauge can work normally and whether the valve is adjusted to the correct working pressure; whether the burner ignition mechanism is available and whether the gate valve is open.
    2. Correct operation steps
    After the equipment is started, it is recommended to control the machine manually at the beginning, and then switch to the automatic control mode after achieving the required production volume and pouring temperature. The stone should be dried and have a stable moisture content as much as possible so that the stone can maintain a stable final temperature when passing through the drying drum. If the stones delivered to the drying drum change frequently and the moisture content changes each time, the burner should be adjusted frequently to compensate for these changes.
    The stones directly from the crushed stone have a relatively constant moisture content, while the stones from the outdoor storage yard have a higher moisture content, and the moisture content of different piles varies greatly. Therefore, it is best for the stones to come from the same source.

    The mobile forced asphalt mixing equipment adopts intermittent drying cylinder, double forced mixer, the main machine can be towed, small footprint, short installation cycle, convenient operation and maintenance, good stability, high degree of automation, high degree of standardization, and high quality of finished products, and the technology of continuous improvement. The mobile forced asphalt mixing plant is suitable for high-grade road asphalt paving and maintenance.
    1. The combined structure of the drum dryer and the batching machine is installed on a movable bracket for easy movement.
    2. The asphalt mixing plant is equipped with a double horizontal shaft to boil the aggregate and ensure uniform mixing.
    3. In the densely arranged hanging barrels, the hot aggregate rises vertically. This lifting tool is easy to use and reliable.
    4. For accurate weighing of aggregates, asphalt and powder ore, a measuring scale is used, which contains a weighing sensor for electronic measurement.
    5. The movement of the power material follows a closed spiral path, which ensures little material loss and provides safe transfer.
    6. On the cyclone burner, high-pressure oil is sprayed out and quickly atomized. In the combustion chamber, the material is fed in a spiral manner and automatically ignited by the oil mist, which ensures combustion efficiency. The cylindrical barrel of the burner is separated from the burner head. The furnace cavity can be pushed in and pulled out, which is convenient for replacing the damaged side column bricks inside the burner. The entire burner has a large heat capacity and high thermal strength. This is cost-effectiveness.

    Asphalt mixing stations, also known as asphalt concrete mixing stations, can produce asphalt mixtures, modified asphalt mixtures, and colored asphalt mixtures, which fully meet the needs of building highways, grade roads, municipal roads, airports, ports, etc. Changmeng Electric Power introduces the safety operating procedures of asphalt mixing plants below:
    1. During the operation of the mixing equipment, in addition to ensuring that the equipment is in good condition, it should also be equipped with a mineral moisture content detector and a finished material tester, and the relevant data should be frequently tested for the operator to adjust the operation in time to keep the equipment in good condition.
    2. In addition to affecting production capacity, the moisture content of mineral materials is also the main factor determining fuel consumption. Additional material sheds should be added.
    3. Before operation, all working parts and devices of the mixing equipment should be fully checked to see if they are intact and normal. If there are any problems, they must be properly handled before operation, and it is forbidden to operate with illness.
    4. The operation must be carried out strictly in accordance with the procedures and precautions specified in the instruction manual. After normal ignition, the dust collector should be monitored to ensure that the drying drum burns under negative pressure; after production starts, the hot material elevator and agitator should be monitored to see if they are working normally to coordinate the operation of other parts.