The drive unit is one of the important components of the asphalt mixing plant, so whether it can be reliably operated must be highly valued to avoid adverse effects on the entire asphalt mixing plant. To ensure that the drive unit in the asphalt mixing plant is indeed complete and reliable, the following maintenance measures are essential.
The first thing to pay attention to is the universal rotating part of the drive unit of the asphalt mixing plant. This part has always been a fault-prone part. In order to reduce the occurrence of faults, grease should be added on time, and the wear should be checked frequently, and repaired and replaced in time. Users should also prepare the universal shaft assembly to avoid affecting the working process of the entire asphalt mixer.

Rated 4.5/5 based on 428 customer reviews
Share:
Content

The drive unit is one of the important components of the asphalt mixing plant, so whether it can be reliably operated must be highly valued to avoid adverse effects on the entire asphalt mixing plant. To ensure that the drive unit in the asphalt mixing plant is indeed complete and reliable, the following maintenance measures are essential.
The first thing to pay attention to is the universal rotating part of the drive unit of the asphalt mixing plant. This part has always been a fault-prone part. In order to reduce the occurrence of faults, grease should be added on time, and the wear should be checked frequently, and repaired and replaced in time. Users should also prepare the universal shaft assembly to avoid affecting the working process of the entire asphalt mixer.
Secondly, the cleanliness of the hydraulic oil used in the asphalt mixing plant must be ensured. After all, the working environment of the equipment is relatively harsh, so it is necessary to prevent sewage and mud from entering the hydraulic system. The hydraulic oil should also be replaced regularly according to the requirements of the manual. Once water or mud is found mixed in the hydraulic oil during inspection, the hydraulic system should be stopped immediately to clean the hydraulic system and replace the hydraulic oil.
Since there is a hydraulic system, of course, a matching cooling device is also required, which is also an important focus in the drive system of the asphalt mixing plant. To ensure that its function can be fully exerted, on the one hand, the hydraulic oil radiator should be cleaned regularly to prevent the radiator from being blocked by cement; on the other hand, the radiator electric fan should be checked to see if it is running normally to prevent the hydraulic oil temperature from exceeding the standard.
    In general, as long as the hydraulic oil of the asphalt mixing plant drive device is kept clean, there are generally few faults; but the service life varies from manufacturer to manufacturer, so pay attention to its alkalinity observation and replace it in real time.

Inquiry


    More Asphalt Processing

    Asphalt mixing stations, also known as asphalt concrete mixing stations, can produce asphalt mixtures, modified asphalt mixtures, and colored asphalt mixtures, which fully meet the needs of building highways, grade roads, municipal roads, airports, ports, etc. Changmeng Electric Power introduces the safety operating procedures of asphalt mixing plants below:
    1. During the operation of the mixing equipment, in addition to ensuring that the equipment is in good condition, it should also be equipped with a mineral moisture content detector and a finished material tester, and the relevant data should be frequently tested for the operator to adjust the operation in time to keep the equipment in good condition.
    2. In addition to affecting production capacity, the moisture content of mineral materials is also the main factor determining fuel consumption. Additional material sheds should be added.
    3. Before operation, all working parts and devices of the mixing equipment should be fully checked to see if they are intact and normal. If there are any problems, they must be properly handled before operation, and it is forbidden to operate with illness.
    4. The operation must be carried out strictly in accordance with the procedures and precautions specified in the instruction manual. After normal ignition, the dust collector should be monitored to ensure that the drying drum burns under negative pressure; after production starts, the hot material elevator and agitator should be monitored to see if they are working normally to coordinate the operation of other parts.

    The mobile forced asphalt mixing equipment adopts intermittent drying cylinder, double forced mixer, the main machine can be towed, small footprint, short installation cycle, convenient operation and maintenance, good stability, high degree of automation, high degree of standardization, and high quality of finished products, and the technology of continuous improvement. The mobile forced asphalt mixing plant is suitable for high-grade road asphalt paving and maintenance.
    1. The combined structure of the drum dryer and the batching machine is installed on a movable bracket for easy movement.
    2. The asphalt mixing plant is equipped with a double horizontal shaft to boil the aggregate and ensure uniform mixing.
    3. In the densely arranged hanging barrels, the hot aggregate rises vertically. This lifting tool is easy to use and reliable.
    4. For accurate weighing of aggregates, asphalt and powder ore, a measuring scale is used, which contains a weighing sensor for electronic measurement.
    5. The movement of the power material follows a closed spiral path, which ensures little material loss and provides safe transfer.
    6. On the cyclone burner, high-pressure oil is sprayed out and quickly atomized. In the combustion chamber, the material is fed in a spiral manner and automatically ignited by the oil mist, which ensures combustion efficiency. The cylindrical barrel of the burner is separated from the burner head. The furnace cavity can be pushed in and pulled out, which is convenient for replacing the damaged side column bricks inside the burner. The entire burner has a large heat capacity and high thermal strength. This is cost-effectiveness.

    The drying drum of the asphalt mixing plant should pay attention to daily inspection, correct operation and reasonable maintenance, so as to extend its service life and reduce the cost of engineering use.
    1. Pay attention to daily inspection. Before the asphalt mixing plant officially works, the drying drum needs to be tested and inspected to see whether each pipeline is reliably connected, whether the lubrication of the whole machine is feasible, whether the motor can be started, whether the functions of each pressure valve are stable, whether the instrument is normal, etc.
    2. Correct operation of the mixing station. At the beginning of the asphalt mixing plant, manual operation can only switch to automatic control after reaching the specified production capacity and discharge temperature. The aggregate should be dry and have a standard mode so that it can maintain a constant temperature when flowing through the drying drum. When the entire aggregate is sent to dry, the moisture content will change. At this time, the burner should be used frequently to compensate for the change in moisture. During the rolling stone processing, the amount of water directly formed is basically unchanged, the amount of combustion accumulation increases, and the amount of water in the deposited accumulation material may change.
    3. Reasonable maintenance of the asphalt mixing plant. Aggregates should be deactivated when the asphalt mixing plant is not in operation. After work every day, the equipment should be operated to discharge the aggregate into the dryer. When the material in the hopper leaves the combustion chamber, the combustion chamber should be closed and allowed to idle for about 30 minutes to cool down, so as to reduce its impact or make the machine run in a straight line. Install the drying cylinder fixing ring on all rollers synchronously.