Maintenance points of asphalt spreading trucks in different working hours

Maintenance points of asphalt spreading trucks in different working hours
per month (or every 200 hours worked);
​Per year (or every 500 hours worked);
Every two years (or every 1,000 hours worked);

Rated 4.8/5 based on 353 customer reviews
Share:
Content

per month (or every 200 hours worked)
1. Check whether the asphalt pump fasteners are loose, and if so, tighten them in time;
2. Check the lubrication condition of the servo pump electromagnetic clutch. If there is lack of oil, add 32-40# engine oil;
3. Check the burner pump filter, oil inlet filter and nozzle filter, clean or replace them in time
​Per year (or every 500 hours worked)
1. Replace the servo pump filter:
2. Replace the hydraulic oil. The hydraulic oil in the pipeline must reach 40 – 50°C to reduce the oil viscosity and fluidity before it can be replaced (start the car at room temperature of 20°C and let the hydraulic pump rotate for a period of time to meet the temperature requirements);
3. Re-tighten the fixed connection of the asphalt tank;
4. Disassemble the nozzle cylinder and check the piston gasket and needle valve;
5. Clean the thermal oil filter element.
Every two years (or every 1,000 hours worked)
1. Replace PLC battery:
2. Replace thermal oil:
3. (Check or replace the burner DC motor carbon brush).
Regular maintenance
1. The liquid level of the oil mist device should be checked before each construction. When there is a lack of oil, ISOVG32 or 1# turbine oil must be added to the upper limit of the liquid level.
2. The lifting arm of the spreading rod should be lubricated with oil in time to prevent rust and other problems from long-term use.
3. Regularly check the heating fire channel of the thermal oil furnace and clean the fire channel and chimney residues.

Inquiry


    More Road Maintenance

    Emulsified modified asphalt equipment is classified according to the production process and can be divided into three types: intermittent emulsified modified asphalt equipment, semi-continuous emulsified modified asphalt equipment, and continuous emulsified modified asphalt equipment. During the production of emulsified modified asphalt equipment, demulsifier, acid, water, and latex modified materials are blended in a soap mixing tank, and then pumped into the asphalt into the colloid mill. After a can of soap is used up, the soap is redispensed, and then the production of the next can is completed.
    The emulsified modified asphalt equipment mentioned here includes hot water pumps and circulation pumps. This type of centrifugal water pump generally uses a pipeline centrifugal pump. There is a sewage outlet at the bottom of the pipeline centrifugal pump. Pay attention to the sewage outlet at the bottom of the emulsified modified asphalt equipment pump. The water in the water tank is released through the filter valve. Some emulsified modified asphalt equipment does not have a filter valve to save equipment costs, so it can only be emptied by loosening the flange bolts at the bottom. There are basically two methods of moisturizing emulsion pumps for emulsified modified asphalt equipment on the market, gear oil pumps or centrifugal water pumps. The gear oil pump can only drain the liquid in the pump through the connecting flange of the pipeline. The centrifugal water pump carries out sewage treatment through its own sewage outlet.
    When used in the production of emulsified modified asphalt equipment, depending on the modified material technology, the latex pipeline can be connected in front of the colloid mill or behind the colloid mill, or there may be no latex pipeline and it must be made manually. Add the required amount of latex into the soap jar.