Home » Products » Asphalt Mixing Plant » Mechanism to avoid asphalt damage in asphalt mixing plant

Mechanism to avoid asphalt damage in asphalt mixing plant

Mechanism to avoid asphalt damage in asphalt mixing plant
1. Asphalt operators should undergo physical examination. Anyone suffering from conjunctivitis, skin disease or allergic reaction to asphalt should not engage in asphalt work.
2. Asphalt operators must apply protective ointment on exposed parts of their skin, and a first aid kit should be provided on the construction site.
3. The factory uniforms and protective equipment of asphalt operators are stored in a centralized manner and are prohibited from being worn home or entering collective dormitories.
4. The transfer of lumpy asphalt should usually be carried out at night and on cloudy days, especially during hot seasons. Small machinery should be used for loading and unloading, and it should not be lifted and transported directly by hand.

Rated 4.8/5 based on 219 customer reviews
Share:
Content

Mechanism to avoid asphalt damage in asphalt mixing plant
1. Asphalt operators should undergo physical examination. Anyone suffering from conjunctivitis, skin disease or allergic reaction to asphalt should not engage in asphalt work.
2. Asphalt operators must apply protective ointment on exposed parts of their skin, and a first aid kit should be provided on the construction site.
3. The factory uniforms and protective equipment of asphalt operators are stored in a centralized manner and are prohibited from being worn home or entering collective dormitories.
4. The transfer of lumpy asphalt should usually be carried out at night and on cloudy days, especially during hot seasons. Small machinery should be used for loading and unloading, and it should not be lifted and transported directly by hand.
5. When using a pump to pump hot asphalt in and out of the oil tank, workers should stay out of the way. When the buoy indicator reaches the allowed capacity, they should stop writing in full load operation in time. When encountering curves or downhill slopes, they should slow down early to avoid emergency braking. , always keep moving at a medium speed when the oil tank is not full.
6. All heating furnaces and equipment should be inspected, and all instruments should be intact. Pumps, valves, circulation systems and safety accessories should meet technical requirements, and overpressure and overtemperature alarm systems should be sensitive and reliable.
7. It is necessary to frequently check whether there are leaks, vibrations and abnormal sounds in the circulation system, regularly check whether the liquid level in the expansion tank exceeds the regulations, whether the sensitivity and reliability of the automatic control system meet the requirements, and dust accumulation should be removed regularly. .
8. When asphalt burns occur, immediately soak in cold water to lower the temperature of the asphalt, reduce the degree of skin burns, and facilitate early healing of the burn wounds; wipe with turpentine to maintain skin integrity, reduce the chance of infection, and shorten the course of the disease. , alleviate the patient’s pain.
9. Personnel who are exposed to asphalt should undergo regular physical examinations twice a year to understand the situation in real time and avoid the onset of occupational diseases.

Inquiry


    More Asphalt Processing

    The actual operation steps of drying drum of asphalt mixing equipment: 1. Pay attention to routine inspection; 2. Proper operation steps; 3. Effective maintenance.
    Drying drum is a cylindrical device specially used for heating and drying stones in asphalt mixing equipment. Proper application and maintenance of drying drum can maximize the performance of drying drum, increase its service life and reduce application cost. Let’s take a look at the actual operation steps below.
    1. Pay attention to routine inspections
    The asphalt mixing equipment drying drum has been tested and inspected before leaving the factory, but it will be subjected to vibration and vibration during transportation to the construction site. A comprehensive inspection should be carried out before use: check whether all anchor bolts are tightened; whether all key pins are properly driven; whether all drive devices are adjusted according to the manufacturer’s instructions; whether all pipe connections are appropriate and whether the three-way joints are reliable; whether the entire equipment is fully lubricated; start the motor and check whether all parts can rotate steadily in the correct rotation direction; whether the pressure gauge can work normally and whether the valve is adjusted to the correct working pressure; whether the burner ignition mechanism is available and whether the gate valve is open.
    2. Correct operation steps
    After the equipment is started, it is recommended to control the machine manually at the beginning, and then switch to the automatic control mode after achieving the required production volume and pouring temperature. The stone should be dried and have a stable moisture content as much as possible so that the stone can maintain a stable final temperature when passing through the drying drum. If the stones delivered to the drying drum change frequently and the moisture content changes each time, the burner should be adjusted frequently to compensate for these changes.
    The stones directly from the crushed stone have a relatively constant moisture content, while the stones from the outdoor storage yard have a higher moisture content, and the moisture content of different piles varies greatly. Therefore, it is best for the stones to come from the same source.

    The drying drum of the asphalt mixing plant should pay attention to daily inspection, correct operation and reasonable maintenance, so as to extend its service life and reduce the cost of engineering use.
    1. Pay attention to daily inspection. Before the asphalt mixing plant officially works, the drying drum needs to be tested and inspected to see whether each pipeline is reliably connected, whether the lubrication of the whole machine is feasible, whether the motor can be started, whether the functions of each pressure valve are stable, whether the instrument is normal, etc.
    2. Correct operation of the mixing station. At the beginning of the asphalt mixing plant, manual operation can only switch to automatic control after reaching the specified production capacity and discharge temperature. The aggregate should be dry and have a standard mode so that it can maintain a constant temperature when flowing through the drying drum. When the entire aggregate is sent to dry, the moisture content will change. At this time, the burner should be used frequently to compensate for the change in moisture. During the rolling stone processing, the amount of water directly formed is basically unchanged, the amount of combustion accumulation increases, and the amount of water in the deposited accumulation material may change.
    3. Reasonable maintenance of the asphalt mixing plant. Aggregates should be deactivated when the asphalt mixing plant is not in operation. After work every day, the equipment should be operated to discharge the aggregate into the dryer. When the material in the hopper leaves the combustion chamber, the combustion chamber should be closed and allowed to idle for about 30 minutes to cool down, so as to reduce its impact or make the machine run in a straight line. Install the drying cylinder fixing ring on all rollers synchronously.

    The asphalt mixing equipment mentioned here may also refer to an asphalt concrete mixing plant. At present, asphalt mixing equipment generally uses a complete set of equipment for mixing. So what are the benefits of using a complete set of equipment?
    1. More effective.
    In today’s industrial production, a complete set of asphalt mixing equipment can help improve production efficiency and ensure product quality. This is why even in a mixing plant, the equipment used is a complete set of equipment.
    2. Ensure quality.
    When mixing asphalt, a certain ratio is set. For this type of asphalt liquid used in different occasions, its ratio control has strict requirements. It is necessary to determine its mixing method and mixing time to ensure that the asphalt liquid is consistent with the production site. One of the advantages of a mixing plant is that the quality can be effectively controlled.
    3. It can be sampled.
    After mixing at the mixing plant, the quality inspector can sample and inspect to ensure that the mixed asphalt liquid meets the use requirements.
    In short, asphalt mixing equipment will use a complete set of equipment, mainly to facilitate the later asphalt to meet production needs. Through the mixing plant, the mixing time and feeding sequence can be better controlled, so that the mixed product can meet different use requirements. And after using the archiving equipment, effective spot checks can be carried out, which can better ensure that the quality meets the construction requirements.