Home » Products » Bitumen Processing » Modification of the electrical control system of modified bitumen equipment

Modification of the electrical control system of modified bitumen equipment

In addition to being used according to regulations, modified bitumen equipment should also be maintained regularly in order to effectively extend the service life of modified bitumen equipment. The delivery pump of modified bitumen equipment, as well as its motor and reducer, need to be maintained in accordance with the specifications of the instructions. If the modified bitumen equipment is parked for a long time, the liquid in the tank and pipeline needs to be drained, and each moving component also needs to be filled with grease. The dust in the control box of the modified bitumen equipment needs to be cleaned once every six months. A dust blower can be used to remove dust to prevent dust from entering the machine and damaging parts. The micro powder machine needs to add unsalted butter once for every 100 tons of emulsified bitumen produced.

Rated 4.5/5 based on 362 customer reviews
Share:
Content

In addition to being used according to regulations, modified bitumen equipment should also be maintained regularly in order to effectively extend the service life of modified bitumen equipment. The delivery pump of modified bitumen equipment, as well as its motor and reducer, need to be maintained in accordance with the specifications of the instructions. If the modified bitumen equipment is parked for a long time, the liquid in the tank and pipeline needs to be drained, and each moving component also needs to be filled with grease. The dust in the control box of the modified bitumen equipment needs to be cleaned once every six months. A dust blower can be used to remove dust to prevent dust from entering the machine and damaging parts. The micro powder machine needs to add unsalted butter once for every 100 tons of emulsified bitumen produced.
I believe that many people are very familiar with modified bitumen equipment. Modified bitumen equipment uses cultivated substrate bitumen as raw material. Ordinary fossil fuels such as gas and fuel methanol such as coal, etc. The combustion function of modified bitumen equipment is insufficient, and the calorific value cannot be fully utilized. Therefore, the cold stone simple system should choose gas fuel, such as diesel and heavy oil.
The renovation of the combustion system of the modified bitumen equipment can also achieve the effect of energy saving and emission reduction. This requires upgrading the heavy oil dual-purpose burner, replacing the heat-resistant and high-pressure heavy oil pump with light oil and heavy oil conversion valve, and the modified bitumen equipment also needs to add a heavy oil supply oil system, plus a liquefied petroleum gas combustion system, and further renovate the electrical equipment control system.
How to make the modified bitumen equipment used for a long time? In addition to the use of modified bitumen equipment in accordance with regulations, it should also be regularly maintained, so as to effectively extend the service life of the modified bitumen equipment. Next, the modified bitumen equipment technicians of the modified bitumen equipment will tell you about this issue, hoping to be of some help to the modified bitumen equipment.
The delivery pump of the modified bitumen equipment, as well as its motor and reducer, need to be maintained according to the specifications of the instructions. If the modified bitumen equipment is parked for a long time, it is necessary to drain the liquid in the tank and pipeline, and each moving component needs to be filled with grease. The modified bitumen equipment needs to clean the dust in the control box once every six months. A dust blower can be used to remove dust. The modified bitumen equipment prevents dust from entering the machine and damaging parts. The modified bitumen equipment micro-powder machine needs to add unsalted butter once for every 100 tons of emulsified bitumen produced.

Inquiry


    More Road Maintenance

    Bitumen decanter equipment can be placed in a complex system as an independent unit, replacing the existing heat source de-barreling method, or in parallel as a core component of a large set of equipment, or it can work independently to meet the requirements of small-scale construction operations.
    The Sinoroader bitumen decanter device is mainly composed of a de-barreling box, a lifting mechanism, a hydraulic thruster and an electrical control system. The box is divided into two chambers, the upper chamber is a barreled bitumen melting chamber, and heating coils are evenly distributed around it. The heating pipe and the bitumen barrel mainly exchange heat in a radiation manner to achieve the purpose of bitumen de-barreling. Several guide rails are the tracks for the bitumen barrel to enter. The lower chamber is mainly to continue heating the bitumen removed from the barrel to make the temperature reach the suction pump temperature (100℃), and then the asphalt pump is pumped into the upper chamber. At the same time, an empty barrel is pushed out at the rear end outlet. There is also an oil tank on the platform at the entrance of the asphalt barrel to prevent the dripping bitumen from flowing out.
    The inlet and outlet doors of the device adopt a spring automatic closing mechanism. The door can be automatically closed after the asphalt barrel is pushed in or out to reduce heat loss. A temperature gauge is installed at the asphalt outlet to observe the asphalt outlet temperature. The electrical control system can control the opening and closing of the hydraulic pump and the reversing of the electromagnetic reversing valve to realize the advance and retreat of the hydraulic cylinder. If the heating time is extended, a higher temperature can be obtained. The lifting mechanism adopts a cantilever structure. The bitumen barrel is lifted by an electric hoist, and then moved horizontally to place the bitumen barrel on the guide rail. A temperature gauge is installed at the outlet of the asphalt meltering equipment to observe its outlet temperature.

    Improve the understanding of the importance of preventive maintenance
    We should further improve the understanding of the importance of preventive maintenance and raise preventive maintenance to the level of highway asset protection and road protection. At present, leaders at all levels and maintenance departments do not fully understand the significance of preventive maintenance of asphalt pavement. We should deepen our understanding of the important role of preventive maintenance and improve the strategic awareness, initiative and creativity of preventive maintenance. At the same time, the maintenance department should strengthen communication and exchanges with transportation authorities and financial management departments at all levels, so that departments at all levels understand the importance and necessity of preventive maintenance and create conditions for the implementation of preventive maintenance and funding sources. At the same time, it is very necessary to add preventive maintenance to the classification of maintenance projects, which will help the management of leaders at all levels and the implementation of preventive maintenance.
    Improve the decision-making and planning of preventive maintenance
    According to the decision-making and planning process, reasonably arrange the preventive maintenance of asphalt concrete pavement structure to ensure the safe and stable operation of highway projects throughout the life cycle, and reduce production costs while providing high-quality traffic services. Therefore, the key to preventive maintenance of asphalt concrete pavement structure lies in establishing a scientific decision-making and planning mechanism. The Ministry of Transport proposed in the “13th Five-Year Plan for Highway Maintenance Management Development” that the average annual mileage of preventive maintenance for expressways should not be less than 8%, and that for ordinary national and provincial roads should not be less than 5%. In the actual application process, local governments should also actively summarize experience and propose different preventive maintenance ratios based on the specific conditions of different regions.