Necessary stages in asphalt mixing plant design

Any kind of mechanical equipment must go through precise design, testing and other processes before it can be manufactured, and the same is true for asphalt mixing stations. According to the survey, the following stages are necessary for any asphalt mixing plant.
First of all, the main technical parameters of the product to be designed must be determined according to market needs, so construction market research, data analysis and other links are indispensable. Secondly, the ideal working principle and the plan to realize this principle will be determined through innovative conception and optimization screening. , a schematic diagram of the overall design scheme should also be given.

Rated 4.6/5 based on 253 customer reviews
Share:
Content

Any kind of mechanical equipment must go through precise design, testing and other processes before it can be manufactured, and the same is true for asphalt mixing stations. According to the survey, the following stages are necessary for any asphalt mixing plant.
First of all, the main technical parameters of the product to be designed must be determined according to market needs, so construction market research, data analysis and other links are indispensable. Secondly, the ideal working principle and the plan to realize this principle will be determined through innovative conception and optimization screening. , a schematic diagram of the overall design scheme should also be given.
After the overall plan is determined, the next step is to determine the details, including processing technology, assembly technology, packaging and transportation, economy, safety, reliability, practicality, etc., so as to determine the location, structural shape and connection method of each component. However, in order to further ensure the future use effect of the asphalt mixing plant, it is necessary to go through the improvement design stage and improve the original design as much as possible.

Inquiry


    More Asphalt Processing

    The drying drum of the asphalt mixing plant should pay attention to daily inspection, correct operation and reasonable maintenance, so as to extend its service life and reduce the cost of engineering use.
    1. Pay attention to daily inspection. Before the asphalt mixing plant officially works, the drying drum needs to be tested and inspected to see whether each pipeline is reliably connected, whether the lubrication of the whole machine is feasible, whether the motor can be started, whether the functions of each pressure valve are stable, whether the instrument is normal, etc.
    2. Correct operation of the mixing station. At the beginning of the asphalt mixing plant, manual operation can only switch to automatic control after reaching the specified production capacity and discharge temperature. The aggregate should be dry and have a standard mode so that it can maintain a constant temperature when flowing through the drying drum. When the entire aggregate is sent to dry, the moisture content will change. At this time, the burner should be used frequently to compensate for the change in moisture. During the rolling stone processing, the amount of water directly formed is basically unchanged, the amount of combustion accumulation increases, and the amount of water in the deposited accumulation material may change.
    3. Reasonable maintenance of the asphalt mixing plant. Aggregates should be deactivated when the asphalt mixing plant is not in operation. After work every day, the equipment should be operated to discharge the aggregate into the dryer. When the material in the hopper leaves the combustion chamber, the combustion chamber should be closed and allowed to idle for about 30 minutes to cool down, so as to reduce its impact or make the machine run in a straight line. Install the drying cylinder fixing ring on all rollers synchronously.

    Asphalt mixing stations, also known as asphalt concrete mixing stations, can produce asphalt mixtures, modified asphalt mixtures, and colored asphalt mixtures, which fully meet the needs of building highways, grade roads, municipal roads, airports, ports, etc. Changmeng Electric Power introduces the safety operating procedures of asphalt mixing plants below:
    1. During the operation of the mixing equipment, in addition to ensuring that the equipment is in good condition, it should also be equipped with a mineral moisture content detector and a finished material tester, and the relevant data should be frequently tested for the operator to adjust the operation in time to keep the equipment in good condition.
    2. In addition to affecting production capacity, the moisture content of mineral materials is also the main factor determining fuel consumption. Additional material sheds should be added.
    3. Before operation, all working parts and devices of the mixing equipment should be fully checked to see if they are intact and normal. If there are any problems, they must be properly handled before operation, and it is forbidden to operate with illness.
    4. The operation must be carried out strictly in accordance with the procedures and precautions specified in the instruction manual. After normal ignition, the dust collector should be monitored to ensure that the drying drum burns under negative pressure; after production starts, the hot material elevator and agitator should be monitored to see if they are working normally to coordinate the operation of other parts.