When using an asphalt mixing plant, first of all, it needs to have good stability. If it does not have good stability, then the asphalt mixing plant will not be able to meet the requirements of the project in terms of requirements or mass production. For road construction, the measurement requirements of asphalt concrete are relatively strict and precise. Only qualified asphalt concrete can make the quality of road construction meet the actual requirements. Therefore, the stability of the asphalt mixing plant is very important.
Secondly, the requirements for the asphalt mixing plant when in use are that the equipment should be as simple as possible on the basis of having all the required functions, and the overall operation should be reduced as much as possible. This can save a lot of manpower input during operation and save corresponding costs. Although it is simple, it does not mean that the technological content of the asphalt mixing plant needs to be reduced.
The above are the requirements that the asphalt mixing plant needs to meet when in use, because if each equipment wants its working effect to achieve the expected appearance, the equipment itself needs to have corresponding conditions. It must be a qualified and convenient equipment to ensure the efficiency and quality of the work.

Rated 4.7/5 based on 389 customer reviews
Share:
Content

When using an asphalt mixing plant, first of all, it needs to have good stability. If it does not have good stability, then the asphalt mixing plant will not be able to meet the requirements of the project in terms of requirements or mass production. For road construction, the measurement requirements of asphalt concrete are relatively strict and precise. Only qualified asphalt concrete can make the quality of road construction meet the actual requirements. Therefore, the stability of the asphalt mixing plant is very important.
Secondly, the requirements for the asphalt mixing plant when in use are that the equipment should be as simple as possible on the basis of having all the required functions, and the overall operation should be reduced as much as possible. This can save a lot of manpower input during operation and save corresponding costs. Although it is simple, it does not mean that the technological content of the asphalt mixing plant needs to be reduced.
The above are the requirements that the asphalt mixing plant needs to meet when in use, because if each equipment wants its working effect to achieve the expected appearance, the equipment itself needs to have corresponding conditions. It must be a qualified and convenient equipment to ensure the efficiency and quality of the work.

Inquiry


    More Asphalt Processing

    The renovation of the combustion-supporting system of the asphalt mixing plant and the use of DC frequency conversion CNC machining technology are all renovations of the original system. In addition to the above renovation plans, with the existing equipment and personnel, what other measures can be taken in the application to reduce the operating costs of concrete mixing plants?
    At present, China has no mandatory national industry standards for heavy residual oil, and the quality of fuel oil varies greatly. Even from the same dealer, the quality difference between batches is very large, and it contains more residues. Therefore, bridge inspection equipment should be installed on the construction site, and professional personnel should inspect various performance parameters of gasoline and diesel to strictly control quality.
    When the burner is working, if the flame of the combustion aid is red and the smoke from the ash removal chimney is black, this is the manifestation of poor atomization of gasoline and diesel and insufficient combustion aid. At this time, the following measures should be taken to deal with it: properly adjust the distance between the nozzle and the vortex plate, generally push it inward to a suitable distance, the purpose is to prevent the atomized oil cone sprayed from the nozzle from spraying into the vortex plate; effectively adjust the ratio of gasoline and diesel to gas, so that the gasoline and diesel increase the mass conversion law slowly, or the gas increase the mass conversion law quickly; promptly remove the carbon deposits and coke around the nozzle to prevent the flame from deflecting; heavy residual oil contains more residues, which can easily cause serious damage to the high-pressure oil pump and increase the working pressure, affecting the actual effect of atomization and the shape of the flame, so the high-pressure oil pump must be repaired or replaced in time; install metal filter devices in front of the first and second high-pressure oil pumps, and clean them frequently to prevent the residues in the gasoline and diesel from blocking the nozzle.
    The operators should be trained in professional skills on a regular basis to strengthen their job responsibilities and moral education, so that they can establish their respective job responsibilities, understand the importance of their positions, understand the content of their work, and improve their professional level. Skilled operators can properly control the temperature of the asphalt mixing plant mixture to avoid gasoline and diesel waste.
    In order to improve the combustion-supporting effect and effectively reduce the operating costs of asphalt mixing stations, Sinoroader Group kindly reminds that the following issues should be noted when using the burner in the asphalt mixing station: To improve the maintenance of the burner, the burner nozzle should be cleaned of charred materials and carbon deposits on the ignition electrode regularly. The nozzle can be disassembled according to the atomization status; the air-oil ratio of the burner is generally not adjusted, and the fuel pump pressure can be adjusted according to the smoke status and the temperature of the asphalt mixture; the sulfur dioxide generated by the combustion of light fuel oil has a strong corrosion to the bag, so the bag should be maintained regularly and the air pressure changes in the bag should be paid close attention to; water deashing will produce more foam, causing the sand settling tank to flow out, so the sand settling tank should be cleaned in time, and a watering design should be carried out to settle the foam; when the steam pressure decreases or the gear oil pump noise increases, the gear oil pump must be replaced.
    When the burner is started, the fuel oil circulation system should be completed through the valve, and then the burner control box should be opened to start the burner. If the electronic ignition of the fuel oil fails, you can change the inlet tee and use the diesel engine for ignition. After the ignition is successful for 2 minutes, you can convert it into fuel oil. In this way, even the light fuel oil of lower quality can ensure combustion.