The application of asphalt mixing plants also involves selection issues. In order to give full play to the performance of the equipment, the model of the machine is mainly determined according to the actual situation of the construction site. It sounds relatively simple, but some details still need to be emphasized.
The so-called specific conditions of the construction site first include the size of the site; secondly, the properties, specifications and working dimensions of the enterprise’s supporting equipment. It is necessary to try to do a good job in all aspects to help improve production efficiency and ensure product quality. In the case of intensive network management, the network management function of the asphalt mixing plant must also be taken into account to avoid difficulties in future upgrades.

Rated 4.8/5 based on 323 customer reviews
Share:
Content

The application of asphalt mixing plants also involves selection issues. In order to give full play to the performance of the equipment, the model of the machine is mainly determined according to the actual situation of the construction site. It sounds relatively simple, but some details still need to be emphasized.
The so-called specific conditions of the construction site first include the size of the site; secondly, the properties, specifications and working dimensions of the enterprise’s supporting equipment. It is necessary to try to do a good job in all aspects to help improve production efficiency and ensure product quality. In the case of intensive network management, the network management function of the asphalt mixing plant must also be taken into account to avoid difficulties in future upgrades.
As for the technical performance of the asphalt mixing plant itself, it must comply with several basic principles such as advancement, reliability, excellence, and versatility to ensure that the equipment can efficiently complete production with advanced technology and a high degree of automation, and ensure the convenience and environmental protection of the process. There is also a price measurement, try to choose products with high cost performance.

Inquiry


    More Asphalt Processing

    The materials used in asphalt mixtures contain a lot of dust. When the equipment is operating, if the dust enters the atmosphere, it will cause pollution. Therefore, dust removal equipment must be installed, and now bag dust removal is the main method. Safety is a common sense issue. There are well-established standard safety rules.
    Do not clean, oil or adjust any mechanical equipment that is not specifically explained during operation; turn off the power and lock it before inspection or repair activities to prepare for accidents. Because each situation has its own particularity. Therefore, be vigilant about safety damage issues, incorrect operation issues and other deficiencies. All of them may lead to accidents, personal injuries, reduced production efficiency, and more importantly, loss of life. Careful and early prevention is the best way to avoid accidents.
    Careful and correct maintenance can make the equipment work more efficiently and control it within a certain level of pollution; the maintenance of each component should be carried out according to its operating standards; maintenance plans and safe operation procedures should be formulated according to the inspection and repair conditions that must be carried out.
    Take out a work log to record all inspection and repair conditions, list the analysis of each inspection of each component and the description of the repair content or the date of the repair; the second step is to give the inspection cycle for each component, which should be determined according to the service life and wear condition of each component.

    The drying drum of the asphalt mixing plant should pay attention to daily inspection, correct operation and reasonable maintenance, so as to extend its service life and reduce the cost of engineering use.
    1. Pay attention to daily inspection. Before the asphalt mixing plant officially works, the drying drum needs to be tested and inspected to see whether each pipeline is reliably connected, whether the lubrication of the whole machine is feasible, whether the motor can be started, whether the functions of each pressure valve are stable, whether the instrument is normal, etc.
    2. Correct operation of the mixing station. At the beginning of the asphalt mixing plant, manual operation can only switch to automatic control after reaching the specified production capacity and discharge temperature. The aggregate should be dry and have a standard mode so that it can maintain a constant temperature when flowing through the drying drum. When the entire aggregate is sent to dry, the moisture content will change. At this time, the burner should be used frequently to compensate for the change in moisture. During the rolling stone processing, the amount of water directly formed is basically unchanged, the amount of combustion accumulation increases, and the amount of water in the deposited accumulation material may change.
    3. Reasonable maintenance of the asphalt mixing plant. Aggregates should be deactivated when the asphalt mixing plant is not in operation. After work every day, the equipment should be operated to discharge the aggregate into the dryer. When the material in the hopper leaves the combustion chamber, the combustion chamber should be closed and allowed to idle for about 30 minutes to cool down, so as to reduce its impact or make the machine run in a straight line. Install the drying cylinder fixing ring on all rollers synchronously.