With the rapid development of our country’s social development and the continuous development of economic and information technology, modern highway construction is also developing rapidly, and the requirements for ground structural materials are becoming higher and higher, and Asphalt concrete bonding raw materials are inseparable from modified asphalt equipment. So besides these influencing factors, what other reasons does the company have that people don’t understand? Let’s analyze it together.
There are some asphalt concrete equipment on the market, because they have not solved the problem of asphalt clogging before grinding, there are not enough preparation equipment and grinding equipment, the structure is unscientific, and the entire grinding process cannot achieve a certain particle size, resulting in modification. The product productivity of asphalt equipment is low and the product quality is unstable. It requires continuous grinding for a long time, creating problems. This will not only greatly increase energy consumption, increase costs, make product quality unstable, and affect the speed of highway construction.