The quality of the asphalt mixing plant will be a key factor affecting the quality of the project. After reviewing relevant materials related to the production and construction of asphalt concrete, we summarized some cases of failures in asphalt concrete mixing stations during construction and analyzed the reasons.
1. Unstable output and low production efficiency of asphalt mixing plants
(1) Improper proportioning. The mix ratio of asphalt concrete is divided into target mix ratio and production mix ratio. Among them, the target mix ratio controls the cold material transportation ratio of sand and gravel materials, and the production mix ratio is the mixing ratio of various types of sand and stone materials in the finished asphalt concrete materials specified in the design. The production mix ratio is determined by the laboratory, which directly determines the off-site grading standard of the finished asphalt concrete. The target mix ratio is set to further ensure the production mix ratio, and can be adjusted appropriately during production according to the actual situation. When the target mix ratio or the production mix ratio is not appropriate, the stones stored in each measurement of the asphalt mixing station will be disproportionate, with some overflowing and some other materials, unable to be weighed in time, and the mixing cylinder will be idling, resulting in reduced output.