Preparation items for micro-surfacing slurry sealing: materials, construction machinery (micro-surfacing paver) and other auxiliary equipment.
The micro-surface slurry seal requires emulsified asphalt and stone that meet the standards. The metering system of the micro-surfacing paver needs to be calibrated before construction. The production of emulsified asphalt requires asphalt heating tanks, emulsified asphalt production equipment (capable of producing asphalt content greater than or equal to 60%), and emulsified asphalt finished product tanks. In terms of stone, mineral screening machines, loaders, forklifts, etc. are needed to screen out oversized stones.
The tests required include emulsification test, screening test, mixing test and the equipment and technical personnel required to do these tests.