1. Observation: Pay attention to the dynamics of the road surface after milling (three to four days), and pave the milled and roughened road surface in time when paving conditions are met.
2. On-site mixing: During construction and production, a sealing slurry truck should be used for on-site mixing. Through the metering equipment of the sealing truck and on-site operation by a robot, it is ensured that emulsified asphalt, water, mineral materials, fillers, etc. can be mixed according to a certain proportion. , stir through the mixing box, and the paving thickness is not higher than the roughing depth.