Home » Products » Asphalt Mixing Plant » The brief analysis of the specific requirements for selection of asphalt mixture mixing equipment
The brief analysis of the specific requirements for selection of asphalt mixture mixing equipment

The brief analysis of the specific requirements for selection of asphalt mixture mixing equipment

Asphalt (composition: asphaltenes and resin) tanks are divided into: intermittent and continuous functions according to the production process: initial batching of aggregates, heating and drying, screening and measurement; heating and insulation of asphalt (composition: asphaltene and resin) , transportation and measurement; transportation and measurement of filler; uniformly mix the measured aggregate, asphalt (composition: asphaltene and resin), and filler into a finished product of a certain temperature.

Rated 4.8/5 based on 218 customer reviews
Share:
Content

Asphalt (composition: asphaltenes and resin) tanks are divided into: intermittent and continuous functions according to the production process: initial batching of aggregates, heating and drying, screening and measurement; heating and insulation of asphalt (composition: asphaltene and resin) , transportation and measurement; transportation and measurement of filler; uniformly mix the measured aggregate, asphalt (composition: asphaltene and resin), and filler into a finished product of a certain temperature.
The production capacity meets the requirements appropriately; the gradation composition of the mixed asphalt (composition: asphaltene and resin) mixture should meet the requirements; the stone ratio is allowed to be within ±0.3%; the wet mixing time should not exceed the requirements (generally no more than 30s) , because the temperature of the aggregate in the mixer is as high as about 170°C, the asphalt is sprayed on the surface of the aggregate in the form of a film (thin, soft and transparent sheet), and at the same time the contact area with the air increases, which is related to heating, transportation, storage insulation and temperature rise. Compared with other processes, asphalt ages quickly in the mixer.
It is necessary to be equipped with a secondary dust collector (function: purify the air) to meet environmental protection requirements; when the aggregate moisture content is 5% and the discharge temperature is 130°C~160°C, the mixing equipment can operate at its extra productivity. The number of equipped cold silos should meet the competition ratio requirements and be capable of primary grading and metering.
The main burner requires a large air-to-oil ratio, easy adjustment, reliable operation, simple and rapid combustion, reliable atomization, sufficient combustion, stable flame, fast heating, and low fuel consumption.

Inquiry


    More Video