Asphalt mixing plant is one of the main equipment for producing asphalt concrete. It can mix asphalt, gravel, cement and other materials together in a certain proportion to obtain the products required for highway construction. In order to ensure its operating effect, the asphalt mixing station also needs to be powered on for trial operation before it is officially put into work.
At the beginning of the test run, first run a single motor, and at the same time check whether the current, steering, insulation and mechanical transmission parts are operating normally. After confirming that each motor and mechanical transmission parts are operating correctly, conduct a joint trial run. During the entire process, it is necessary to conduct patrol inspections of key parts. If any abnormal noise is found, the cause should be identified and eliminated in a timely manner.

Rated 4.8/5 based on 597 customer reviews
Share:
Content

Asphalt mixing plant is one of the main equipment for producing asphalt concrete. It can mix asphalt, gravel, cement and other materials together in a certain proportion to obtain the products required for highway construction. In order to ensure its operating effect, the asphalt mixing station also needs to be powered on for trial operation before it is officially put into work.
At the beginning of the test run, first run a single motor, and at the same time check whether the current, steering, insulation and mechanical transmission parts are operating normally. After confirming that each motor and mechanical transmission parts are operating correctly, conduct a joint trial run. During the entire process, it is necessary to conduct patrol inspections of key parts. If any abnormal noise is found, the cause should be identified and eliminated in a timely manner.
After turning on the power, turn on the air compressor and let the air pressure reach the rated pressure value. During this process, you can clearly observe whether there is air leakage in the control valve, pipeline, cylinder and other components. Then connect the oil supply and return devices, oil supply and return pipelines, etc., and ensure that they do not leak. At the same time, use anti-rust components or take anti-rust measures.
Since the asphalt mixing plant contains many mechanical components, a complete set of commissioning operations requires consideration of all aspects, such as the hydraulic department, conveying mechanism, dust removal system, etc., and none of them can be left out. The heating efficiency of the asphalt conveying pipe of the asphalt mixing station also has a great impact. This is because the important performance indicators of asphalt, such as viscosity and sulfur content, are closely related to the asphalt mixing station.
Generally speaking, the greater the viscosity, the worse the atomization effect, which directly affects work efficiency and fuel consumption. As the temperature increases, the viscosity of heavy oil gradually decreases, so high-viscosity oil must be heated for smooth transportation and atomization.
Therefore, in addition to understanding its conventional indicators when selecting, you must also master its viscosity-temperature curve to ensure that heating can make the asphalt reach the viscosity required by the burner before atomization. When inspecting the asphalt circulation system, it was found that the asphalt in the pipeline solidified because the temperature of the asphalt transportation pipeline did not meet the requirements.

Inquiry


    More Asphalt Processing

    The asphalt mixing equipment mentioned here may also refer to an asphalt concrete mixing plant. At present, asphalt mixing equipment generally uses a complete set of equipment for mixing. So what are the benefits of using a complete set of equipment?
    1. More effective.
    In today’s industrial production, a complete set of asphalt mixing equipment can help improve production efficiency and ensure product quality. This is why even in a mixing plant, the equipment used is a complete set of equipment.
    2. Ensure quality.
    When mixing asphalt, a certain ratio is set. For this type of asphalt liquid used in different occasions, its ratio control has strict requirements. It is necessary to determine its mixing method and mixing time to ensure that the asphalt liquid is consistent with the production site. One of the advantages of a mixing plant is that the quality can be effectively controlled.
    3. It can be sampled.
    After mixing at the mixing plant, the quality inspector can sample and inspect to ensure that the mixed asphalt liquid meets the use requirements.
    In short, asphalt mixing equipment will use a complete set of equipment, mainly to facilitate the later asphalt to meet production needs. Through the mixing plant, the mixing time and feeding sequence can be better controlled, so that the mixed product can meet different use requirements. And after using the archiving equipment, effective spot checks can be carried out, which can better ensure that the quality meets the construction requirements.

    The actual operation steps of drying drum of asphalt mixing equipment: 1. Pay attention to routine inspection; 2. Proper operation steps; 3. Effective maintenance.
    Drying drum is a cylindrical device specially used for heating and drying stones in asphalt mixing equipment. Proper application and maintenance of drying drum can maximize the performance of drying drum, increase its service life and reduce application cost. Let’s take a look at the actual operation steps below.
    1. Pay attention to routine inspections
    The asphalt mixing equipment drying drum has been tested and inspected before leaving the factory, but it will be subjected to vibration and vibration during transportation to the construction site. A comprehensive inspection should be carried out before use: check whether all anchor bolts are tightened; whether all key pins are properly driven; whether all drive devices are adjusted according to the manufacturer’s instructions; whether all pipe connections are appropriate and whether the three-way joints are reliable; whether the entire equipment is fully lubricated; start the motor and check whether all parts can rotate steadily in the correct rotation direction; whether the pressure gauge can work normally and whether the valve is adjusted to the correct working pressure; whether the burner ignition mechanism is available and whether the gate valve is open.
    2. Correct operation steps
    After the equipment is started, it is recommended to control the machine manually at the beginning, and then switch to the automatic control mode after achieving the required production volume and pouring temperature. The stone should be dried and have a stable moisture content as much as possible so that the stone can maintain a stable final temperature when passing through the drying drum. If the stones delivered to the drying drum change frequently and the moisture content changes each time, the burner should be adjusted frequently to compensate for these changes.
    The stones directly from the crushed stone have a relatively constant moisture content, while the stones from the outdoor storage yard have a higher moisture content, and the moisture content of different piles varies greatly. Therefore, it is best for the stones to come from the same source.