Home » Products » Bitumen Processing » What are the energy-saving methods of emulsified modified bitumen equipment?

What are the energy-saving methods of emulsified modified bitumen equipment?

Some of the equipment of emulsified modified bitumen equipment are as follows. The specially made bitumen filter can effectively filter the residues and dirt in the high-temperature culture medium bitumen to avoid damage to the subsequent equipment. The emulsified modified bitumen equipment adopts a spiral plate type or a shell and tube heat exchanger to quickly heat the culture medium bitumen through high-temperature heat transfer oil to meet the needs of the production process. The emulsified modified bitumen equipment is heated in the storage tank to prevent the bitumen from aging due to long-term high-temperature heating and exposure to the air. The sulfate generated during the production process of the emulsified modified bitumen equipment is very limited, reducing air pollution.
The emulsified modified bitumen equipment sends the modified material manually poured into the dumping bin to the bitumen batching tank by wind or spiral. It can be equipped with a metering and calibration system. The emulsified modified bitumen equipment thickener is automatically or manually added. The emulsified modified bitumen equipment can be equipped with a metering and calibration system. Emulsified modified bitumen equipment transportation and metering and calibration system, the emulsified modified bitumen equipment adds the set bitumen amount to the batching tank through the frequency converter and computer interlock. The emulsified modified bitumen equipment and bitumen steam flowmeter use big brand products to ensure the preparation.

Rated 5/5 based on 491 customer reviews
Share:
Content

Some of the equipment of emulsified modified bitumen equipment are as follows. The specially made bitumen filter can effectively filter the residues and dirt in the high-temperature culture medium bitumen to avoid damage to the subsequent equipment. The emulsified modified bitumen equipment adopts a spiral plate type or a shell and tube heat exchanger to quickly heat the culture medium bitumen through high-temperature heat transfer oil to meet the needs of the production process. The emulsified modified bitumen equipment is heated in the storage tank to prevent the bitumen from aging due to long-term high-temperature heating and exposure to the air. The sulfate generated during the production process of the emulsified modified bitumen equipment is very limited, reducing air pollution.
The emulsified modified bitumen equipment sends the modified material manually poured into the dumping bin to the bitumen batching tank by wind or spiral. It can be equipped with a metering and calibration system. The emulsified modified bitumen equipment thickener is automatically or manually added. The emulsified modified bitumen equipment can be equipped with a metering and calibration system. Emulsified modified bitumen equipment transportation and metering and calibration system, the emulsified modified bitumen equipment adds the set bitumen amount to the batching tank through the frequency converter and computer interlock. The emulsified modified bitumen equipment and bitumen steam flowmeter use big brand products to ensure the preparation.
1. The bitumen batching tank of the emulsified modified bitumen equipment prepares bitumen concrete according to the secret recipe, and ensures uniform mixing through its combined stirring device. It has a pre-cutting effect on the SBS in the bitumen.
2. The emulsified modified bitumen equipment can be equipped with multiple swelling tanks to meet the technological requirement of 45 to 60 minutes of swelling time.
3. The emulsified modified bitumen equipment uses a circulating water pump to pump the prepared bitumen concrete into the swelling tank for swelling and growth
4. The micro-powder machine or three-stage fast cutting machine is the key to the modified bitumen equipment, which is directly related to the quality of the product. The raw materials of the emulsified modified bitumen equipment are torn and crushed under the rapid shearing of the multi-level double-layer high-precision coordinated stator and motor stator, so that the SBS becomes fine particles and is evenly dispersed in the bitumen to form a relatively stable colloidal solution, which is bitumen concrete.
5. Computer control system This modified bitumen equipment can control the preparation of each material, the total flow rate, the temperature of each point according to technical requirements, can control each machine according to the steps, and can print out production tables, etc. The electronic components are all well-known brands.
As an bitumen equipment, the emulsified modified bitumen equipment has good performance. The production capacity and the prerequisites of the emulsified modified bitumen equipment affect the processing technology of the emulsified modified asphalt equipment. Some manufacturers have added an environmental protection device to the manufactured equipment, the vaporization heat recovery device. Recycle the heat back home to reduce energy consumption. As a finished product in the production process, the inlet and outlet temperature of the general emulsified modified asphalt equipment is about 85℃, and the inlet and outlet temperature of the demulsified asphalt concrete needs to be above 95℃.
Many emulsified modified asphalt equipment do not use the heat of evaporation, but directly enter the finished product tank, and the heat is lost at will, resulting in energy consumption. In the production process of emulsified modified bitumen equipment, water, as a production raw material, needs to be heated from room temperature to about 55°C. The heat of evaporation of the emulsified modified asphalt equipment is transferred to the drainage. It is found that after the emulsified modified asphalt equipment has produced 5 tons, with the significant increase in the temperature of the cooling circulating water, the production water uses cooling circulating water, and the water basically does not need to be heated. Simply from the energy, 1/2 of the fuel can be saved. Therefore, the use of emulsified modified asphalt equipment can achieve environmental protection and energy saving under the corresponding conditions.

Inquiry


    More Road Maintenance

    Asphalt spreader is used to spread the penetration oil, waterproof layer and bonding layer of the bottom layer of asphalt pavement of high-grade highway. It can also be used for the construction of county and township highway oil roads with layered paving technology. It consists of a car chassis, an asphalt tank, an asphalt pumping and spraying system, a thermal oil heating system, a hydraulic system, a combustion system, a control system, a pneumatic system, and an operating platform.
    Knowing how to properly operate and maintain the asphalt spreader can not only extend the service life of the equipment, but also enable the construction project to proceed smoothly. So what problems should the asphalt spreader pay attention to when working? The technicians of Gaoyuan Road Construction Machinery Equipment Co., Ltd. give you tips:
    1). Before use, please check whether the position of each valve is accurate and make preparations before work. After starting the motor of the asphalt spreader, check the four thermal oil valves and the pressure gauge. After everything is normal, start the engine and the power take-off starts to work. Test the asphalt pump and circulate for 5 minutes. If the pump head shell is hot, slowly close the thermal oil pump valve. If the heating is insufficient, the pump will not turn or make noise. In this case, the valve needs to be opened to continue heating the asphalt pump until it can operate normally. During the working process, the asphalt liquid must be kept at a working temperature of 160~180℃, and it cannot be filled too full (pay attention to the liquid level pointer during the injection of asphalt liquid, and check the tank mouth at any time). After the asphalt liquid is injected, the filling port must be closed tightly to prevent the asphalt liquid from overflowing during transportation.
    2). During use, asphalt may not be pumped in. At this time, it is necessary to check whether the interface of the asphalt suction pipe is leaking. When the asphalt pump and pipeline are blocked by solidified asphalt, a blowtorch can be used for baking, and the pump must not be forced to turn. When baking, care should be taken to avoid directly baking the ball valve and rubber parts.
    3). When spraying asphalt, the car should be driven at a low speed. Do not step on the accelerator hard, otherwise it may cause damage to the clutch, asphalt pump and other components. If 6m wide asphalt is spread, pay attention to obstacles on both sides at any time to prevent collision with the spreading pipe. At the same time, the asphalt should be kept in a large circulation state until the spreading work is completed. After the work is completed every day, if there is any remaining asphalt, it must be returned to the asphalt pool, otherwise it will solidify in the tank and cannot work next time.
    4). In addition, the emulsifier must also pay attention to daily maintenance:
    1. The emulsifier and delivery pump and other motors, agitators, and valves should be maintained daily.
    2. The emulsifier should be cleaned after work every day.
    3. The speed regulating pump used to control the flow should be regularly tested for accuracy, and adjusted and maintained in time. The asphalt emulsifier should regularly check the matching clearance between its stator and rotor. When the minimum clearance specified by the machine cannot be reached, the stator and rotor should be replaced.
    4. If the equipment is out of use for a long time, the liquid in the tank and pipeline should be emptied (the emulsifier aqueous solution should not be stored for a long time), the hole covers should be tightly closed, kept clean, and the running parts should be filled with lubricating oil. When it is used for the first time or when it is used again after a long period of inactivity, the rust in the tank should be removed, and the water filter should be cleaned regularly.
    5. Regularly check whether the terminal in the electric control cabinet is loose, whether the wires are worn during shipment, and remove dust to avoid damage to the machine parts. The frequency converter is a precision instrument. Please refer to the instruction manual for specific use and maintenance.
    6. There is a heat transfer oil coil in the emulsifier water solution heating stirring tank. When injecting cold water into the water tank, the heat transfer oil switch should be turned off first, and then the switch should be turned on to heat after adding the required amount of water. Pouring cold water directly into the high-temperature heat transfer oil pipeline can easily cause the weld to crack.

    Emulsified modified asphalt equipment is classified according to the production process and can be divided into three types: intermittent emulsified modified asphalt equipment, semi-continuous emulsified modified asphalt equipment, and continuous emulsified modified asphalt equipment. During the production of emulsified modified asphalt equipment, demulsifier, acid, water, and latex modified materials are blended in a soap mixing tank, and then pumped into the asphalt into the colloid mill. After a can of soap is used up, the soap is redispensed, and then the production of the next can is completed.
    The emulsified modified asphalt equipment mentioned here includes hot water pumps and circulation pumps. This type of centrifugal water pump generally uses a pipeline centrifugal pump. There is a sewage outlet at the bottom of the pipeline centrifugal pump. Pay attention to the sewage outlet at the bottom of the emulsified modified asphalt equipment pump. The water in the water tank is released through the filter valve. Some emulsified modified asphalt equipment does not have a filter valve to save equipment costs, so it can only be emptied by loosening the flange bolts at the bottom. There are basically two methods of moisturizing emulsion pumps for emulsified modified asphalt equipment on the market, gear oil pumps or centrifugal water pumps. The gear oil pump can only drain the liquid in the pump through the connecting flange of the pipeline. The centrifugal water pump carries out sewage treatment through its own sewage outlet.
    When used in the production of emulsified modified asphalt equipment, depending on the modified material technology, the latex pipeline can be connected in front of the colloid mill or behind the colloid mill, or there may be no latex pipeline and it must be made manually. Add the required amount of latex into the soap jar.