Home » Products » Asphalt Mixing Plant » What are the maintenance tasks of asphalt tanks in asphalt mixing plants?

What are the maintenance tasks of asphalt tanks in asphalt mixing plants?

Asphalt mixing plants are large-scale products with high professional and technical requirements, and are composed of multiple systems. Among them, asphalt tanks are also a very critical part. Whether it is manufacturing, debugging or installation, it needs to be operated according to the actual application needs of users.
In addition to the manufacturing, debugging and installation, which need to be operated by installers, the maintenance of asphalt tanks in asphalt mixing plants must also be managed by professionals. At the same time, they must strictly follow all safety rules to operate. Before operation, they must be proficient in the relevant requirements and based on the regulations and safety instructions for storing and handling hot asphalt.

Rated 5/5 based on 390 customer reviews
Share:
Content

Asphalt mixing plants are large-scale products with high professional and technical requirements, and are composed of multiple systems. Among them, asphalt tanks are also a very critical part. Whether it is manufacturing, debugging or installation, it needs to be operated according to the actual application needs of users.
In addition to the manufacturing, debugging and installation, which need to be operated by installers, the maintenance of asphalt tanks in asphalt mixing plants must also be managed by professionals. At the same time, they must strictly follow all safety rules to operate. Before operation, they must be proficient in the relevant requirements and based on the regulations and safety instructions for storing and handling hot asphalt.
Because there are many issues involved, there are also many things to pay attention to when applying. Regarding the maintenance work of asphalt tanks in asphalt mixing plant equipment, the specific contents are as follows:
First of all, we know that temperature is a very critical factor affecting the quality of asphalt. Therefore, it is necessary to control the temperature of the asphalt tank of the asphalt mixing plant, and the control process is completed through electric valves, bellows stop valves and thermostats. The temperature can be measured by a contact thermometer. Contact pressure gauges are usually installed at the front end of the hot oil pipeline and are equipped with manual control in case of emergency. Note that during operation, all asphalt tanks must be monitored and adjusted individually. Each asphalt tank is equipped with an overflow component, and there are sound alarms and alarm display lights in the control room. During the heating of the asphalt in the asphalt tank, the stop valve at the outlet of the thermal oil riser in the asphalt tank should be closed.
In addition to the above temperature control, the asphalt tanks in the asphalt mixing plant must be handled with care during some maintenance processes. This is because the system contains very hot liquids and burns must be prevented. Cleaning is also required. In addition, the connecting flanges and slideways should be checked regularly to avoid leakage. If leakage occurs, the operation should be stopped immediately and repaired.

Inquiry


    More Asphalt Processing

    The renovation of the combustion-supporting system of the asphalt mixing plant and the use of DC frequency conversion CNC machining technology are all renovations of the original system. In addition to the above renovation plans, with the existing equipment and personnel, what other measures can be taken in the application to reduce the operating costs of concrete mixing plants?
    At present, China has no mandatory national industry standards for heavy residual oil, and the quality of fuel oil varies greatly. Even from the same dealer, the quality difference between batches is very large, and it contains more residues. Therefore, bridge inspection equipment should be installed on the construction site, and professional personnel should inspect various performance parameters of gasoline and diesel to strictly control quality.
    When the burner is working, if the flame of the combustion aid is red and the smoke from the ash removal chimney is black, this is the manifestation of poor atomization of gasoline and diesel and insufficient combustion aid. At this time, the following measures should be taken to deal with it: properly adjust the distance between the nozzle and the vortex plate, generally push it inward to a suitable distance, the purpose is to prevent the atomized oil cone sprayed from the nozzle from spraying into the vortex plate; effectively adjust the ratio of gasoline and diesel to gas, so that the gasoline and diesel increase the mass conversion law slowly, or the gas increase the mass conversion law quickly; promptly remove the carbon deposits and coke around the nozzle to prevent the flame from deflecting; heavy residual oil contains more residues, which can easily cause serious damage to the high-pressure oil pump and increase the working pressure, affecting the actual effect of atomization and the shape of the flame, so the high-pressure oil pump must be repaired or replaced in time; install metal filter devices in front of the first and second high-pressure oil pumps, and clean them frequently to prevent the residues in the gasoline and diesel from blocking the nozzle.
    The operators should be trained in professional skills on a regular basis to strengthen their job responsibilities and moral education, so that they can establish their respective job responsibilities, understand the importance of their positions, understand the content of their work, and improve their professional level. Skilled operators can properly control the temperature of the asphalt mixing plant mixture to avoid gasoline and diesel waste.
    In order to improve the combustion-supporting effect and effectively reduce the operating costs of asphalt mixing stations, Sinoroader Group kindly reminds that the following issues should be noted when using the burner in the asphalt mixing station: To improve the maintenance of the burner, the burner nozzle should be cleaned of charred materials and carbon deposits on the ignition electrode regularly. The nozzle can be disassembled according to the atomization status; the air-oil ratio of the burner is generally not adjusted, and the fuel pump pressure can be adjusted according to the smoke status and the temperature of the asphalt mixture; the sulfur dioxide generated by the combustion of light fuel oil has a strong corrosion to the bag, so the bag should be maintained regularly and the air pressure changes in the bag should be paid close attention to; water deashing will produce more foam, causing the sand settling tank to flow out, so the sand settling tank should be cleaned in time, and a watering design should be carried out to settle the foam; when the steam pressure decreases or the gear oil pump noise increases, the gear oil pump must be replaced.
    When the burner is started, the fuel oil circulation system should be completed through the valve, and then the burner control box should be opened to start the burner. If the electronic ignition of the fuel oil fails, you can change the inlet tee and use the diesel engine for ignition. After the ignition is successful for 2 minutes, you can convert it into fuel oil. In this way, even the light fuel oil of lower quality can ensure combustion.

    The asphalt mixing equipment mentioned here may also refer to an asphalt concrete mixing plant. At present, asphalt mixing equipment generally uses a complete set of equipment for mixing. So what are the benefits of using a complete set of equipment?
    1. More effective.
    In today’s industrial production, a complete set of asphalt mixing equipment can help improve production efficiency and ensure product quality. This is why even in a mixing plant, the equipment used is a complete set of equipment.
    2. Ensure quality.
    When mixing asphalt, a certain ratio is set. For this type of asphalt liquid used in different occasions, its ratio control has strict requirements. It is necessary to determine its mixing method and mixing time to ensure that the asphalt liquid is consistent with the production site. One of the advantages of a mixing plant is that the quality can be effectively controlled.
    3. It can be sampled.
    After mixing at the mixing plant, the quality inspector can sample and inspect to ensure that the mixed asphalt liquid meets the use requirements.
    In short, asphalt mixing equipment will use a complete set of equipment, mainly to facilitate the later asphalt to meet production needs. Through the mixing plant, the mixing time and feeding sequence can be better controlled, so that the mixed product can meet different use requirements. And after using the archiving equipment, effective spot checks can be carried out, which can better ensure that the quality meets the construction requirements.

    The actual operation steps of drying drum of asphalt mixing equipment: 1. Pay attention to routine inspection; 2. Proper operation steps; 3. Effective maintenance.
    Drying drum is a cylindrical device specially used for heating and drying stones in asphalt mixing equipment. Proper application and maintenance of drying drum can maximize the performance of drying drum, increase its service life and reduce application cost. Let’s take a look at the actual operation steps below.
    1. Pay attention to routine inspections
    The asphalt mixing equipment drying drum has been tested and inspected before leaving the factory, but it will be subjected to vibration and vibration during transportation to the construction site. A comprehensive inspection should be carried out before use: check whether all anchor bolts are tightened; whether all key pins are properly driven; whether all drive devices are adjusted according to the manufacturer’s instructions; whether all pipe connections are appropriate and whether the three-way joints are reliable; whether the entire equipment is fully lubricated; start the motor and check whether all parts can rotate steadily in the correct rotation direction; whether the pressure gauge can work normally and whether the valve is adjusted to the correct working pressure; whether the burner ignition mechanism is available and whether the gate valve is open.
    2. Correct operation steps
    After the equipment is started, it is recommended to control the machine manually at the beginning, and then switch to the automatic control mode after achieving the required production volume and pouring temperature. The stone should be dried and have a stable moisture content as much as possible so that the stone can maintain a stable final temperature when passing through the drying drum. If the stones delivered to the drying drum change frequently and the moisture content changes each time, the burner should be adjusted frequently to compensate for these changes.
    The stones directly from the crushed stone have a relatively constant moisture content, while the stones from the outdoor storage yard have a higher moisture content, and the moisture content of different piles varies greatly. Therefore, it is best for the stones to come from the same source.