Home » Products » Asphalt Mixing Plant » What are the reasons for insufficient delivery force of asphalt mixing plant?

What are the reasons for insufficient delivery force of asphalt mixing plant?

It is inevitable that the asphalt mixing plant will have insufficient pumping force during use. In fact, during the construction process, as long as the asphalt mixing station is operated in accordance with regulations, and the accessories are cleaned and replaced in time, the asphalt mixing plant will generally not have insufficient pumping force. Now the editor of the asphalt mixing station manufacturer briefly introduces the common solutions to insufficient pumping force of asphalt mixing plant as follows.

Rated 4.9/5 based on 595 customer reviews
Share:
Content

It is inevitable that the asphalt mixing plant will have insufficient pumping force during use. In fact, during the construction process, as long as the asphalt mixing station is operated in accordance with regulations, and the accessories are cleaned and replaced in time, the asphalt mixing plant will generally not have insufficient pumping force. Now the editor of the asphalt mixing station manufacturer briefly introduces the common solutions to insufficient pumping force of asphalt mixing plant as follows.
1. Replace the cutting ring
With the extension of the use time, the wear gap between the eyeglass plate and the cutting ring of the asphalt mixing station may be too large. For this, just replace the eyeglass plate cutting ring in time.
2. Replace the main oil cylinder filter in time
After the asphalt mixing plant is used, if the main oil cylinder filter of the asphalt mixing plant pump is not cleaned in time, it is easy to cause the main oil cylinder filter of the asphalt mixing plant to be blocked. It is very necessary to clean and replace the main oil cylinder filter in time for this phenomenon.
3. Blocked oil circuit
After inspection, if too much hydraulic oil is found, it is likely to cause blocked oil circuit. If this phenomenon is caused by water mixed in the hydraulic oil, the hydraulic oil can be left to stand for a while to allow the water to sink to the bottom of the hydraulic oil tank, and then the water can be removed; if the hydraulic oil has been emulsified due to excessive water, new hydraulic oil should be replaced; if the hydraulic oil is turbid due to air mixed, check whether the hydraulic system pipeline is leaking and cut off the source of air mixing.
4. Replace the sealing ring
If the cylinder seal of the asphalt mixing plant is damaged, it is likely to cause hydraulic oil leakage. At this time, the sealing ring must be replaced in time.
The legs of the concrete pumping and mixing machine must be fixed, and the ground must be flat and solid. Keep the equipment in a horizontal position and do not tilt during construction. It is convenient for the concrete mixer truck to enter and exit and feed into the hopper, and it is also conducive to pumping and pipe laying and reducing pumping pressure loss. At the same time, it is required to be close to the pouring site and convenient for power supply and water supply.
Insufficient pumping power of small concrete pump is a problem that is easily encountered in construction. Once this phenomenon occurs, don’t worry. You can check and solve it one by one from the above four aspects. Through the above introduction, I believe that most friends have some understanding of the mixer trailer pump.

Inquiry


    More Asphalt Processing

    Asphalt mixing stations, also known as asphalt concrete mixing stations, can produce asphalt mixtures, modified asphalt mixtures, and colored asphalt mixtures, which fully meet the needs of building highways, grade roads, municipal roads, airports, ports, etc. Changmeng Electric Power introduces the safety operating procedures of asphalt mixing plants below:
    1. During the operation of the mixing equipment, in addition to ensuring that the equipment is in good condition, it should also be equipped with a mineral moisture content detector and a finished material tester, and the relevant data should be frequently tested for the operator to adjust the operation in time to keep the equipment in good condition.
    2. In addition to affecting production capacity, the moisture content of mineral materials is also the main factor determining fuel consumption. Additional material sheds should be added.
    3. Before operation, all working parts and devices of the mixing equipment should be fully checked to see if they are intact and normal. If there are any problems, they must be properly handled before operation, and it is forbidden to operate with illness.
    4. The operation must be carried out strictly in accordance with the procedures and precautions specified in the instruction manual. After normal ignition, the dust collector should be monitored to ensure that the drying drum burns under negative pressure; after production starts, the hot material elevator and agitator should be monitored to see if they are working normally to coordinate the operation of other parts.