What configurations are used in stainless steel bitumen melter plant? How is it different from traditional equipment?

Stainless steel bitumen melters use bitumen concrete micro-powder machines. Its blade strength is high, the angular velocity of the moving disc is high, and the gap can be adjusted to 0.15mm. Stainless steel bitumen melters are suitable for the production and processing of various polymer bitumen concrete, such as SBS, PE, EVA, etc.
Stainless steel bitumen melters use independently developed special batching tanks, stainless steel bitumen melter force stirring devices, liquid level meter overflow prevention equipment, granular material dosage and equipment, liquid additive automatic addition equipment and other production key points. It ensures the full-position process guarantee for the stainless steel bitumen melter of the bitumen concrete production line. The stainless steel bitumen melter processing stainless steel bitumen melter rate is significantly increased, and the quality of stainless steel bitumen melters is greatly improved.

Rated 4.5/5 based on 270 customer reviews
Share:
Content

Stainless steel bitumen melters use bitumen concrete micro-powder machines. Its blade strength is high, the angular velocity of the moving disc is high, and the gap can be adjusted to 0.15mm. Stainless steel bitumen melters are suitable for the production and processing of various polymer bitumen concrete, such as SBS, PE, EVA, etc.
Stainless steel bitumen melters use independently developed special batching tanks, stainless steel bitumen melter force stirring devices, liquid level meter overflow prevention equipment, granular material dosage and equipment, liquid additive automatic addition equipment and other production key points. It ensures the full-position process guarantee for the stainless steel bitumen melter of the bitumen concrete production line. The stainless steel bitumen melter processing stainless steel bitumen melter rate is significantly increased, and the quality of stainless steel bitumen melters is greatly improved.
The biggest feature of stainless steel bitumen melters is fast heating, which can produce high-temperature bitum,en in large quantities, save heat, and temporarily obtain a small amount of hot bitumen. The production of hot bitumen at 160°C by stainless steel bitumen melter plants generally does not exceed 2 hours.
The stainless steel bitumen melter plant is another new bitumen heating storage equipment developed by combining the characteristics of traditional high-temperature thermal oil heating asphalt heating storage equipment and internal fire part rapid asphalt heating storage equipment.
The stainless steel bitumen melter plant makes up for the shortcomings of traditional high-temperature thermal oil heating equipment with long heating time and high energy consumption.
The electric heater set inside the stainless steel bitumen melter plant is suitable for asphalt storage and heating in transportation and municipal stainless steel bitumen melter equipment engineering systems. The stainless steel bitumen melter plant uses L-band heat (high-temperature thermal oil) as the heat transfer medium, raw coal, natural gas or oil furnace as the heat source, and is forced to circulate by the hot oil pump to heat the bitumen to the use temperature.

Inquiry


    More Road Maintenance

    Asphalt spreader is an irreplaceable tool for highway maintenance. Asphalt spreader is an irreplaceable tool for highway maintenance. Highway maintenance is divided into four categories according to the nature of the project, scale, and technical complexity: minor repair, medium repair, major repair, and improvement. Specific classification:
    (1) Minor repair and maintenance project: preventive maintenance and repair of slightly damaged parts of the highway and all its engineering facilities to keep them in good condition. It is usually planned and carried out daily by the maintenance team within the annual minor repair and maintenance quota funds on a monthly (ten-day) basis.
    (2) Medium repair project: regular repair and reinforcement of general wear and tear and local damage of highway engineering facilities to restore them to their original state. It is usually planned and implemented by grassroots road maintenance agencies on an annual (seasonal) basis.
    (3) Major repair project: periodic comprehensive repair of major damage to highway facilities to fully restore them to the original design standards, or local improvements and individual additions within the original technical level to gradually improve the highway’s traffic capacity. It is usually organized and implemented by grassroots road maintenance agencies or with the help of their superior agencies according to the approved annual project budget.
    (4) Improvement projects are large projects that improve the technical level of roads and their engineering facilities in stages and sections due to their inability to meet traffic volume and load requirements, or significantly improve traffic capacity through improvements. It is usually organized and implemented or completed through bidding by regional road maintenance agencies or provincial road maintenance agencies according to the approved plan and design budget. As a manufacturer of asphalt spreaders, we welcome you to visit us.

    Asphalt spreader is used to spread the penetration oil, waterproof layer and bonding layer of the bottom layer of asphalt pavement of high-grade highway. It can also be used for the construction of county and township highway oil roads with layered paving technology. It consists of a car chassis, an asphalt tank, an asphalt pumping and spraying system, a thermal oil heating system, a hydraulic system, a combustion system, a control system, a pneumatic system, and an operating platform.
    Knowing how to properly operate and maintain the asphalt spreader can not only extend the service life of the equipment, but also enable the construction project to proceed smoothly. So what problems should the asphalt spreader pay attention to when working? The technicians of Gaoyuan Road Construction Machinery Equipment Co., Ltd. give you tips:
    1). Before use, please check whether the position of each valve is accurate and make preparations before work. After starting the motor of the asphalt spreader, check the four thermal oil valves and the pressure gauge. After everything is normal, start the engine and the power take-off starts to work. Test the asphalt pump and circulate for 5 minutes. If the pump head shell is hot, slowly close the thermal oil pump valve. If the heating is insufficient, the pump will not turn or make noise. In this case, the valve needs to be opened to continue heating the asphalt pump until it can operate normally. During the working process, the asphalt liquid must be kept at a working temperature of 160~180℃, and it cannot be filled too full (pay attention to the liquid level pointer during the injection of asphalt liquid, and check the tank mouth at any time). After the asphalt liquid is injected, the filling port must be closed tightly to prevent the asphalt liquid from overflowing during transportation.
    2). During use, asphalt may not be pumped in. At this time, it is necessary to check whether the interface of the asphalt suction pipe is leaking. When the asphalt pump and pipeline are blocked by solidified asphalt, a blowtorch can be used for baking, and the pump must not be forced to turn. When baking, care should be taken to avoid directly baking the ball valve and rubber parts.
    3). When spraying asphalt, the car should be driven at a low speed. Do not step on the accelerator hard, otherwise it may cause damage to the clutch, asphalt pump and other components. If 6m wide asphalt is spread, pay attention to obstacles on both sides at any time to prevent collision with the spreading pipe. At the same time, the asphalt should be kept in a large circulation state until the spreading work is completed. After the work is completed every day, if there is any remaining asphalt, it must be returned to the asphalt pool, otherwise it will solidify in the tank and cannot work next time.
    4). In addition, the emulsifier must also pay attention to daily maintenance:
    1. The emulsifier and delivery pump and other motors, agitators, and valves should be maintained daily.
    2. The emulsifier should be cleaned after work every day.
    3. The speed regulating pump used to control the flow should be regularly tested for accuracy, and adjusted and maintained in time. The asphalt emulsifier should regularly check the matching clearance between its stator and rotor. When the minimum clearance specified by the machine cannot be reached, the stator and rotor should be replaced.
    4. If the equipment is out of use for a long time, the liquid in the tank and pipeline should be emptied (the emulsifier aqueous solution should not be stored for a long time), the hole covers should be tightly closed, kept clean, and the running parts should be filled with lubricating oil. When it is used for the first time or when it is used again after a long period of inactivity, the rust in the tank should be removed, and the water filter should be cleaned regularly.
    5. Regularly check whether the terminal in the electric control cabinet is loose, whether the wires are worn during shipment, and remove dust to avoid damage to the machine parts. The frequency converter is a precision instrument. Please refer to the instruction manual for specific use and maintenance.
    6. There is a heat transfer oil coil in the emulsifier water solution heating stirring tank. When injecting cold water into the water tank, the heat transfer oil switch should be turned off first, and then the switch should be turned on to heat after adding the required amount of water. Pouring cold water directly into the high-temperature heat transfer oil pipeline can easily cause the weld to crack.