After use, asphalt mixing equipment needs to be disassembled, cleaned, and maintained before it can be saved for next use. Not only is the disassembly process of the equipment important, but the previous preparation work also has a greater impact, so it cannot be neglected. Please pay attention to the detailed introduction below for specific content.

Rated 4.5/5 based on 275 customer reviews
Share:
Content

After use, asphalt mixing equipment needs to be disassembled, cleaned, and maintained before it can be saved for next use. Not only is the disassembly process of the equipment important, but the previous preparation work also has a greater impact, so it cannot be neglected. Please pay attention to the detailed introduction below for specific content.
Since the asphalt mixing equipment is relatively large and has a complex structure, a feasible disassembly and assembly plan should be developed based on the location and actual situation before disassembly, and instructions should be given to the relevant staff. At the same time, it is necessary to inspect the equipment and its components; ensure that the power supply, water source, air source, etc. of the equipment are turned off.
In addition, asphalt mixing equipment should be marked with a unified digital identification positioning method before disassembly, especially for electrical equipment. Some marking symbols should also be added to provide a basis for the installation of the equipment. In order to ensure the installability of the operation, appropriate machines should be used during disassembly, and the disassembled parts should be properly kept without loss or damage.