Before the construction of the asphalt mixing station, the top surface of the asphalt mixer construction range should be cleared, and the site elevation should be kept dry and flat to meet the design requirements. When the surface is too soft, the foundation should be reinforced to prevent the construction machinery from becoming unstable and ensure that the pile frame is vertical. The construction machinery entering the site should be checked to ensure that the machinery is in good condition, and assembled and tested. The verticality of the mixer should be ensured, and the deviation of the gantry guide and the mixing shaft from the verticality of the ground should not exceed 1.0%.