Asphalt Mixing Plants Weighing Control System Operation Key Points
Asphalt Mixing Plants Weighing Control System Operation Key Points
1. Turn on the power
Before connecting the power to the asphalt mixing station, you should first close the DC24V air switch (the air switch does not need to be cut off after shutting down), and then turn the "POWER CONTROL" (start switch) to the "ON" state. At this time, observe and check whether the "POWER" (red indicator light) on the panel is lit. If it is lit, it indicates that the power of the control system has been connected. Wait for about 1 minute and check whether the touch screen displays normally. If it displays normally, it means that the power supply is normal. Otherwise, it should be inspected.