A brief introduction to the milling and planing construction technology of the original highway road surface
A brief introduction to the construction process of milling and planing the original road surface of the expressway is as follows:
1. First, according to the third pair of construction lanes and the oil spillage on the road within the width of the two marking lines, control the position, width, and depth of the milled micro-surface road surface (the depth is not higher than 0.6CM, which increases the friction coefficient of the road surface). The requirements for the second deputy are the same as above.
2. Prepare the milling machine to be positioned along one side of the starting point, adjust the position, and adjust the height of the discharge port according to the height of the dump truck compartment. The dump truck stops directly in front of the milling machine and waits to receive the milled material.