Three minutes to distinguish the permeable layer, adhesive layer, and sealing layer and the construction sequence
Don't know what is "permeable layer, adhesive layer, and sealing layer? Or don't know the "permeable layer, adhesive layer, and sealing layer construction sequence" please look over here and read this article carefully!
Let's talk about the construction sequence first. The permeable layer oil must be sprayed within 6 hours after the base layer is rolled. The permeable layer oil uses emulsified asphalt PC-2. The amount can be determined by trial spraying at 1.5 liters per square meter, and the penetration depth is not less than 5mm. After spraying the permeable layer oil, the emulsified asphalt PC-1 lower sealing layer is paved. The amount of emulsified asphalt is 1.0 liters per square meter, the aggregate particle size is 0.5 to 1cm, and the thickness should not be less than 0.6 cm. Before paving asphalt concrete, the adhesive layer oil must be sprayed on the upper and lower layers of the lower sealing layer and on the sides of curbs, rainwater outlets, inspection wells and other structures. The adhesive layer oil is Use emulsified asphalt PC-3, with a dosage of 0.5 liters per square meter.
Learn More
2025-04-21