Asphalt mixing station is one of the most important equipment in processing operations, so how to build a station has become a focus of people's concern. The editor has sorted out some key points, hoping to be helpful to everyone.
The first step in building an asphalt mixing station is to determine the main machine and feed batching system. Generally, it is configured according to indicators such as the construction period, total concrete volume, and daily concrete consumption of the project, with the basic principle of being able to meet the daily large concrete consumption. Under normal circumstances, a project can only have one asphalt mixing station, or it can set up mixing stations separately according to the division, or centrally set up a large mixing station and then equipped with an appropriate amount of concrete transport vehicles, all depending on the actual situation.
Secondly, 1-2 water tanks are provided for each asphalt mixing station to provide the required water for concrete mixing and mechanical cleaning during operation. At the same time, there must be a corresponding cement silo, which is used in turn and replenished in time to meet the needs of concrete production without causing cement backlog. Then there is the transportation method of the finished product, which is based on the transportation distance and height and the supply of concrete.