Bitumen heating tanks should do their job well once in place
Products
Application
Case
Customer Support
Blog
Your Position: Home > Blog > Industry Blog
Bitumen heating tanks should do their job well once in place
Release Time:2024-02-04
Read:
Share:
Bitumen heating tanks are a type of road construction equipment and have gradually been widely used. Since they are large-scale equipment, it is necessary to pay attention to relevant operational safety when using them. What tasks should be done after the bitumen heating tank is in place? Today I will explain in detail to you:
Bitumen heating tanks should do their job well once in place_1Bitumen heating tanks should do their job well once in place_2
After the bitumen heating tank is installed in place, please check whether the connections are stable and tight, whether the working parts are flexible, whether the pipelines are clear, and whether the power wiring is correct. When loading bitumen for the first time, please open the exhaust valve to allow the bitumen to Smooth access to heater. Before burning, please fill the water tank with water, open the valve so that the water level in the steam generator reaches a certain height, and close the valve.
When the bitumen heating tank is put into industrial use, potential risks and losses caused by improper operation must be avoided from four aspects: pre-start preparation, startup, production and shutdown. Before using the bitumen heating tank, check the liquid level of the diesel tank, heavy oil tank, and bitumen tank. When the tank contains 1/4 of the oil, it should be replenished in time, and the safety of personnel and auxiliary equipment in each position should be ensured.