The secret to zero accidents in asphalt mixing plant production operations is here!
Preparations before starting up
1. Check
① Understand the impact of weather conditions (such as wind, rain, snow and temperature changes) on the production day;
② Check the liquid levels of diesel tanks, heavy oil tanks, and asphalt tanks every morning. When the tanks contain 1/4 of the oil, they should be replenished in time;
③ Check whether the temperature of the asphalt reaches the production temperature. If it does not reach the production temperature, continue to heat it before starting the machine;
④ Check the aggregate preparation situation according to the ratio of cold aggregate, and the insufficient parts must be prepared for reproduction;
⑤ Check whether the on-duty personnel and auxiliary equipment are complete, such as whether the loader is in place, whether the vehicles are in place, and whether the operators at each position are in place;