How is micro-surfacing constructed on highways?
1. Preparation for construction
First of all, the testing of raw materials must meet technical standard requirements. The metering, mixing, traveling, paving and cleaning systems of the slurry sealing machine should be prevented, debugged and calibrated. Secondly, the diseased areas of the construction pavement must be thoroughly investigated and dealt with in advance to ensure that the original road surface is smooth and complete. Ruts, pits, and cracks must be dug and filled before construction.
Learn More
2023-12-12