Precautions for disassembly and transfer of asphalt mixing plant
The disassembly and assembly work of the mixing station implements a division of labor responsibility system, and relevant plans are formulated and implemented to ensure that the entire process of disassembly, hoisting, transportation and installation is safe and accident-free. At the same time, we should implement the principles of first small before large, easy first before difficult, first ground before high altitude, first peripheral then host, and who disassembles and who installs. In addition, the degree of equipment collapse should be properly controlled to meet the lifting and transportation requirements while maintaining equipment installation accuracy and operational performance.