Key skills for asphalt mixing station construction
Release Time:2024-08-07
Read:
Share:
Before the construction of the asphalt mixing station, the top surface of the asphalt mixer construction range should be cleared, and the site elevation should be kept dry and flat to meet the design requirements. When the surface is too soft, the foundation should be reinforced to prevent the construction machinery from becoming unstable and ensure that the pile frame is vertical. The construction machinery entering the site should be checked to ensure that the machinery is in good condition, and assembled and tested. The verticality of the mixer should be ensured, and the deviation of the gantry guide and the mixing shaft from the verticality of the ground should not exceed 1.0%.
asphalt mixing equipment perform mixture grading and separation_1asphalt mixing equipment perform mixture grading and separation_2
2. Asphalt mixing station construction process measurement and layout → site leveling, trench excavation → deep mixer in place → pre-mixing sinking → slurry preparation → spraying mixing lifting → repeated mixing sinking → repeated mixing lifting to the orifice → pipeline cleaning → machine displacement. Shandong asphalt mixer price
3. The layout of the asphalt mixing station is based on the pile position plan, and the error shall not exceed 2CM. Equipped with 110KVA construction electricity and Φ25mm water pipes, double-shaft mixing machinery and auxiliary slurry mixing equipment and conveying pipelines, strictly ensure the verticality of the mixer guide frame.
4. Construction method After the double-shaft mixer is positioned, turn on the mixer motor, pre-mix the cut soil and sink it, and use the wet spraying method.
After the mixing shaft sinks to the designed depth, start to lift the drill and spray at a speed of 0.45-0.8m/min. The slurry should be prepared before lifting and placed in the aggregate hopper. After the spraying and stirring until the ground turns over, sink and stir again to fully mix the soil and slurry.