1. Dust control at production sites
The floor space and material field of asphalt mixing station equipment are generally 20 to 30 acres of land. The demolition of building areas, green areas and large areas will generate dust. According to the asphalt mixing station, it is recommended that the construction site be completely hardened, the dust sprayed on the cement floor be reduced in time, or the cleaning truck be cleaned and lowered in time. Dust and dirt.
2. Stone powder processing in material field
When a loader loads rocks, a large amount of dust often appears. In actual operation, the material field can be closed according to the actual situation. It keeps away dust and keeps stones and fallen leaves out of the rain.
3. Dust pollution prevention and control cold aggregate supply system
When loading, especially fine aggregate with high dust content, a large amount of dust will be generated due to the impact of the falling stone and the speed. Asphalt mixing station manufacturer