What application skills should we master when using electric heated asphalt tanks?
Products
Application
Case
Customer Support
Blog
Your Position: Home > Blog > Industry Blog
What application skills should we master when using electric heated asphalt tanks?
Release Time:2024-06-12
Read:
Share:
Electrically heated asphalt tanks are one of the common equipment used in road construction projects. If you want to make better use of electrically heated asphalt tanks, you must understand the relevant usage conditions and common problems of asphalt tanks. The safe and correct method of operating electrically heated asphalt tanks is very important. It is very important for users to be careful when using electric heated asphalt tanks to avoid dangerous accidents! After the electric heating asphalt tank equipment is installed, it is necessary to check whether the connections of all parts of the equipment are stable and tight, whether the running parts are flexible, whether the pipelines are smooth, and whether the power wiring is correct. When loading asphalt for the first time, please open the exhaust valve to allow the asphalt to enter the heater smoothly. Please pay attention to the water level of the electric heating asphalt tank during operation, and adjust the valve to keep the water level at the appropriate position.
What application skills should we master when using electric heated asphalt tanks_1What application skills should we master when using electric heated asphalt tanks_2
When the asphalt tank is in use, if the asphalt contains moisture, please open the top inlet hole of the tank when the temperature is 100 degrees, and start the internal circulation dehydration. During the operation of the asphalt tank, pay attention to the water level of the asphalt tank and adjust the valve to keep the water level at the appropriate position. When the asphalt liquid level in the asphalt tank is lower than the thermometer, please close the suction valves before stopping the asphalt pump to prevent the asphalt in the heater from flowing back. On the next day, start the motor first and then open the three-way valve. Before ignition, fill the water tank with water, open the valve so that the water level in the steam generator reaches a certain height, and close the valve. After dehydration is completed, pay attention to the indication of the thermometer and pump out the high-temperature asphalt in time. If the temperature is too high and there is no need to indicate it, please quickly start the internal circulation cooling.
    This is the introduction to the relevant knowledge points about electric heating asphalt tanks. I hope the above content can be helpful to you. Thank you for your viewing and support. If you don’t understand anything or want to consult, you can directly Contact our staff and we will serve you wholeheartedly.