What are the construction methods of asphalt mixing station?
Release Time:2024-11-08
Read:
Share:
Asphalt mixing station is constructed according to certain steps, which can not only ensure the construction quality, but also ensure that the asphalt mixer is not damaged. Although the construction details are very important, the key methods of asphalt mixing station construction should also be used flexibly. Let's take a look at the mesh belt of Sinoroader Group asphalt mixing station;
Discussion on the modification of dust removal equipment in asphalt concrete mixing plant_1Discussion on the modification of dust removal equipment in asphalt concrete mixing plant_2
First of all, before the construction of the asphalt mixing station, the collapsible loess on the top of the wall within the construction range of the asphalt mixer should be removed, and the dry and flat site design elevation should be maintained to meet the design requirements. If the soil is too soft, the roadbed should be reinforced to prevent the construction machinery from being unbalanced and ensure that the pile frame is vertical.
Secondly, the construction machinery entering the site should be inspected to ensure that the machine is intact and assembled and tested under the conditions specified. The flatness of the asphalt mixing station, the guide of the dragon and the mixing shaft should not exceed 1.0% of the error of the road surface flatness.
Then, the construction layout of the asphalt mixing station should be carried out according to the pile position plan, and the deviation should not exceed 2CM. The asphalt mixer is equipped with a 110KVA construction power supply and a Φ25mm water pipe to ensure that its power supply and each transportation management method are normal and stable.
When the asphalt mixing station is ready for positioning, the mixing station motor can be turned on, and the wet spraying method can be used to pre-mix the cut soil to make it move down; until the mixing shaft moves down to the designed depth, the drill anchor spraying can be started at a rate of 0.45-0.8 m/min. The above are several construction methods that the editor of Sinoroader Group asphalt mixing equipment company will tell you today. If you need asphalt mixing equipment, you can contact our asphalt mixing station at any time.