After the block bitumen melting equipment is metered and calibrated, it is unloaded onto the far-rotating conveyor belt. The block bitumen melting equipment is sent to the inclined belt conveyor by the conveyor belt, and the inclined belt conveyor is transported to the waiting hopper inside the mixer to wait for instructions. At the same time, concrete and fly ash are transported by the screw conveyor to their respective metering and calibration hoppers for metering and calibration. Water and water reducer products are separated by centrifugal water pumps and water reducer products. The concrete is submerged in the concrete and is metered and calibrated in the respective metering and calibration hoppers.
What are the advantages of the new drum melting machine after improvement_1What are the advantages of the new drum melting machine after improvement_2
After the metering and calibration of various raw materials of the block bitumen melting equipment is completed, the control system management issues instructions to gradually put them into the mixer for mixing. After the mixing is completed, the loading door of the mixer is opened, and the cement concrete is unloaded into the mixer through the dumping bin, and then enters the next working cycle system.
The block bitumen melting equipment uses the technology of joint control. It measures and displays the basic parameters of the block bitumen melting equipment in real time through sensors, system configuration circuits, display panels, etc., and controls the electronic devices to control the entire mechanical equipment of the block bitumen melting equipment. According to the different uses of processing cement concrete, it can be divided into product block bitumen melting equipment and construction project block bitumen melting equipment. Commercial mixing stations are mainly used for processing and selling cement concrete, while construction project mixing stations usually produce cement concrete from scratch. Of course, the direct feeding methods of the two are also different. Therefore, when choosing a mixing station, it is necessary to choose according to the needs of the block bitumen melting equipment.
In the production and processing of block asphalt melting equipment using cement stabilized soil mixing station machinery, in order to better meet the requirements of construction, the required mixing materials and seasoning ratios are all strict. The block asphalt melting equipment is aimed at some related requirements on the seasoning ratio in the cement stabilized soil mixing machinery industry. The maximum particle size distribution of coarse aggregate in block asphalt melting equipment should not exceed 30mm.
Block bitumen melting equipment can allow a small amount of high-grade oversized stone to be added, but its share should not exceed 2%. Coarse aggregate should be taken to maintain the mortar mix ratio, and the small particle size distribution component should not exceed 10%. The share of fine stone according to the 0.3 round hole sieve is not less than 15%. The water-cement ratio of concrete in block asphalt melting equipment is controlled within the range of 0.4-0.6, the slump of concrete is 14-16cm, the water-cement ratio of concrete should be 38%~45%, and underwater concrete should be carried out within two hours after concrete mixing. Concrete with too large slump measurement error in block bitumen melting equipment cannot enter the hopper, and it is strictly forbidden to add water to the hopper.